148 3029140000
Application
range
B
'&6
,2
.
Plan, install, and operate optimally
Operation norm-compliant and safe
Additional marking and enhanced potential
distribution possibility
You can use the multi-functional channel the left to
equip marker holder you can use for third cross-
connection, providing one common feeding for adjoining
feed through and disconnect terminals. Thus allowed
absoloutly flexibillity during the planning, installation and
operation phase.Signal loop testing
During your DCS marshalling signal loop checks, you can
insert your probes need not only upstream and downstream
the fuse closed position you also can open the fuse carrier
while your test probes are plugged.
Signal marshalling Operation
B.
Without any pitch the marker could fixed over every
terminal block well endplates one line. This allows you make
before break testing. Additionally the strip markers offers big
marking area for multiple lines.
Endless strip marker
The endless strip marker fits perfectly the terminal rail.
Hollow screw head equipped versions
In order ease and increase your efficiency signal loop
verifications, our “STB” versions are equipped with tightening
screws with hollow screw heads thus allowing direct and
secure insertion appropriate test probes hands-free
operations