EMI/RFI shielding interconnection systems

| Kategorie: Leták / Datasheet  |

Vydal: Inotec electronics GmbH

Strana 123 z 132

Jak získat tento dokument?






Poznámky redaktora
10 1 ca. this step, not enter the flange completely but keep approx. Slide the crimp ferrule forward until contact with the flange. Variations cable construction materials may require the processing following different assembly procedures. Only now slide the crimp flange completely underneath shield mesh and cable sheath. 3. Original Inotec crimp flange system . Important: During the crimping process the flange has lay on the crimp dies.10 121 www. 5. Slip the crimp flange over the conductors and possible inter- mediate layers and slide underneath the shield mesh and the cable sheath.1 ca. Enter the flange with cautious rotation while holding back the shield mesh. The faces the hexagon should parallel to the straight sides the crimp flanges (see illustration). longer than the jacket.10 1 ca.inotec-electronics. Fold back the braid over the cable sheath and slide the crimp ferrule the cable. With the cable-specific crimp data definition determine the required assembly parameters, component diameters and tool sizes for every specific application service for our customer (see facing page). 2.10 1 ca.com 1. Please note: Our insertion tool CFE facilitates the handling of the flange step and 4.10 1 ca. Standard assembly procedure KV0001 The standard procedure described below allows easy and re- liable assembly process for the major part all shielded cables. Keep position and crimp with the indicated crimp dies. 4. distance the ca- ble sheath order facilitate the cutting the shield mesh. Cut off any overlapping braid around the flange. Dismantle the cable down the braid and cut the braid, leaving approx