EMI/RFI shielding interconnection systems

| Kategorie: Leták / Datasheet  |

Vydal: Inotec electronics GmbH

Strana 123 z 132

Jak získat tento dokument?






Poznámky redaktora
com 1.10 1 ca. longer than the jacket. Slip the crimp flange over the conductors and possible inter- mediate layers and slide underneath the shield mesh and the cable sheath. Original Inotec crimp flange system . distance the ca- ble sheath order facilitate the cutting the shield mesh. 2. this step, not enter the flange completely but keep approx. Only now slide the crimp flange completely underneath shield mesh and cable sheath.10 1 ca. Variations cable construction materials may require the processing following different assembly procedures.10 1 ca. Enter the flange with cautious rotation while holding back the shield mesh. Cut off any overlapping braid around the flange. 5. The faces the hexagon should parallel to the straight sides the crimp flanges (see illustration). Keep position and crimp with the indicated crimp dies.1 ca. Slide the crimp ferrule forward until contact with the flange. Fold back the braid over the cable sheath and slide the crimp ferrule the cable. Dismantle the cable down the braid and cut the braid, leaving approx. Standard assembly procedure KV0001 The standard procedure described below allows easy and re- liable assembly process for the major part all shielded cables. 4.inotec-electronics.10 1 ca. With the cable-specific crimp data definition determine the required assembly parameters, component diameters and tool sizes for every specific application service for our customer (see facing page).10 121 www. 3. Important: During the crimping process the flange has lay on the crimp dies. Please note: Our insertion tool CFE facilitates the handling of the flange step and 4