Introduction to Electrical Engineering

| Kategorie: Kniha  | Tento dokument chci!

Pro: ČEKO IMPORT a.s.
Vydal: České vysoké učení technické Praha Autor: Vladimír Kůla, Michal Kříž

Strana 98 z 112

Jak získat tento dokument?






Poznámky redaktora
.ERECTION AND OPERATION ELECTRICAL TEST EQUIPMENT 99 If other risks are likely occur during test and experiments, e. The persons mentioned above shall ensure that all persons other that persons have left the test area before the test equipment is: - switched on, case voltages 1000 V - made case voltages exceeding kV In case test stations all persons must have leave the test area before the test station is switched on. Test procedure Assembly work and tests shall not performed simultaneously this could result in danger. In exceptional cases skilled persons may enter the test area the operational status ready to switch operation. test laboratories, experimental stations and temporary test equipment with voltages exceeding 1kV, switching operations may only performed upon the personal order of the nominated person control the work activity, when he/she does not perform this duty himself/herself. In the event fault during tests, parts the test object and test equipment which are not live during normal operation can subjected dangerous voltages. In case test laboratories, experimental stations and temporary test equipment with voltages exceeding kV, all persons must leave the test the test area before the test equipment made . exceptional cases, work has carried out these parts, suitable insulating devices and auxiliary means shall be used. Work activities carried out the prohibition zone (live working) shall comply with the requirements 50110-1. This does not apply when endurance tests have left running the test equipment.Measures shall taken ensure that the prohibition zone not reached. The person carrying out the test shall able recognize the operational status any time, especially when several voltages are supplied.g. The nominated person control the work activity shall make sure that their instructions are carried out correctly before the experiment: - switched on, case voltages 1000V - made ready switch case voltages exceeding kV Orders for switching operations may only given nominated person control the work activity. Before leaving the test equipment, the out operation condition shall established.9. 11. noise, explosions, radiations flying parts, gas formation, fire hazardous materials, additional safety measures shall taken ensure adequate protection.