Testing includes also activities prove the
effectiveness e.
Testing may include measurement activities.
Defects, which constitute immediate danger, shall rectified without delay.g. Working procedures
General
According the basic principles, the nominated person control the electrical
installation and the nominated person control the work activity shall both ensure that
specific and detailed instructions are given the personnel carrying out the work before starting
the work.2.
Measurement
Measurement defined activities measure physical data.
Only skilled instructed persons shall carry out disconnecting reconnecting before or
after dead working. The following five essential
requirements:
- disconnect completely,
- secure against re-connection,
- verify that the installation dead,
- provide earthing and short-circuiting,
.
Electrical installations shall inspected suitable intervals.OPERATION ELECTRICAL INSTALLATIONS
90
- operations intended modify electrical installation, use equipment, connect,
disconnect, start stop equipment designed used for this purpose without risks so
far reasonably practical.
Testing
Testing includes all activities designed check the operation the electrical, mechanical,
thermal condition electrical installation.
10.
The most work activities are being provided dead working. Measurement may be
required check the correct functioning equipment ensure that safety precautions are
adequate. New electrical installations well modifications and
extensions existing installations should inspected prior their being brought into
operation.
Operating activities may carried out locally remote control. protective devices and safety circuits.
Inspection
The purpose inspection verify that electrical installation accordance with
specified technical and safety regulations the relevant standards and may include verification
of the normal state that installation.
- disconnecting reconnecting installations for working