ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 18 z 79







Poznámky redaktora
6. 2. Step step. 11. Connect the voltage and the other cable. 8. Remove the old PCB. 5. 13. Disconnect the cable the PCB from the thyristors, fans and thermal switch.5) for the gate wires and other internal connections. Mount the front cover. Fig. Please note that the gate wires have a new connection position - See colour marking Fig. These PCB have white colored connectors (see Fig.Start here if Replacing PCB marked Rev revision (Not valid for 690V). Discharge the package with the new PCB by moving earth. 7. Fig. Mount also the connector for Supply Voltage. Mount the cable the PCB from the thyristors, fans and thermal switch. Mount the new PCB. Please note that the gate cable connections are different the new PCB, Check this following the cable colors figure 6 below. Disconnect all cables from the terminals to. 1. 9. 10. New PCB rev later PS make sure that you are placing the jumper for supply voltage the correct position, 110 120V 220 240V. Also make sure that you have connected the cables from the thyristors in the correct position differ from the old PCB DS Ready for start!! -. Older PCB with connectors. Discharge the tools and yourself by touching earth (if you are not earthed).12 3. Remove the front cover. This chapter valid replacing broken with newer revision (rev later) PCB. 4. Disconnect the voltage from terminals 1L1, 3L2 and 5L3 (main supply).. 6