Fig.5) for the gate wires and other internal connections. Mount also the connector for Supply Voltage. Disconnect all cables from the terminals to. 2. Remove the old PCB. Disconnect the cable the PCB from the thyristors, fans and thermal switch. Discharge the package with the new PCB by moving earth. Mount the new PCB.12 3. 10. Please note that the gate wires have a new connection position - See colour marking Fig. This chapter valid replacing broken with newer revision (rev later) PCB. Discharge the tools and yourself by touching earth (if you are not earthed). Step step. 13. 9. 6. These PCB have white colored connectors (see Fig. Fig.. Please note that the gate cable connections are different the new PCB, Check this following the cable colors figure 6 below. Connect the voltage and the other cable. Remove the front cover. 7. 1. 8. 11. 4. New PCB rev later PS make sure that you are placing the jumper for supply voltage the correct position, 110 120V 220 240V. 6. 5. Older PCB with connectors. Disconnect the voltage from terminals 1L1, 3L2 and 5L3 (main supply).Start here if Replacing PCB marked Rev revision (Not valid for 690V). Also make sure that you have connected the cables from the thyristors in the correct position differ from the old PCB DS Ready for start!! -. Mount the cable the PCB from the thyristors, fans and thermal switch. Mount the front cover