ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 18 z 79







Poznámky redaktora
Discharge the tools and yourself by touching earth (if you are not earthed). 2.. Fig. Please note that the gate wires have a new connection position - See colour marking Fig.12 3. 4.5) for the gate wires and other internal connections. Mount the front cover. Remove the old PCB. This chapter valid replacing broken with newer revision (rev later) PCB. Older PCB with connectors. 11. Mount also the connector for Supply Voltage. 9. Fig. Step step. Remove the front cover. Connect the voltage and the other cable. Disconnect all cables from the terminals to. 10. 6. Mount the new PCB. Disconnect the cable the PCB from the thyristors, fans and thermal switch. Mount the cable the PCB from the thyristors, fans and thermal switch.Start here if Replacing PCB marked Rev revision (Not valid for 690V). Disconnect the voltage from terminals 1L1, 3L2 and 5L3 (main supply). 5. Please note that the gate cable connections are different the new PCB, Check this following the cable colors figure 6 below. Discharge the package with the new PCB by moving earth. 1. 13. 7. 6. These PCB have white colored connectors (see Fig. 8. Also make sure that you have connected the cables from the thyristors in the correct position differ from the old PCB DS Ready for start!! -. New PCB rev later PS make sure that you are placing the jumper for supply voltage the correct position, 110 120V 220 240V