16. Reassembly the softstarter 19. 18. Ready for start!! -. 17.14. The slope may not more than mm. Connect all cables the terminals 20, external keypad, PTC sensor and the Fieldbus plug. Handle the semiconductor with care. Connect the cables terminals 1L1, 3L2 and 5L3 (main voltage) and 2T1, 4T2 and 6T3 if necessarily (motor connection). Centre the semiconductor with the guide pin. 15. Turn the component that the gate wires point the right direction. Tighten each nut half turn alternately until the spring gap indicators are just trapped, then tighten 1/4 turn. Don't let the guide pin scratch the contact surfaces. 20. Screw the nuts hand that the clamp is parallel the heat sink