ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 19 z 79







Poznámky redaktora
7) for the gate wires and other internal connections. Remove the old PCB. Mount the cable the PCB from the thyristors, fans and thermal switch. Disconnect the cable the PCB from the thyristors, fans and thermal switch. 11. This part valid replacing broken PCB with new PCB with the same revision newer, Step step.12. Mount the front cover. DS Ready for start!! -. Mount also the connector for Supply Voltage. See Fig 6 9. Mount the new PCB. New PCB rev I or later. Disconnect the voltage from terminals 1L1, 3L2 and 5L3 (main supply). 8. PS make sure that you are placing the jumper for supply voltage the correct position, 110 120V 220 240V. 1. Discharge the tools and yourself by touching earth (if you are not earthed). 2. Connect the voltage and the other cable. Fig. 3. 4. 5.Start here if Replacing PCB marked Rev later (also for 690V Rev I) These PCB have white colored connectors (see Fig. 7. Discharge the package with the new PCB by moving earth. Remove the front cover. 6. Disconnect all cables from the terminals to. 10