ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 19 z 79







Poznámky redaktora
6. New PCB rev I or later.Start here if Replacing PCB marked Rev later (also for 690V Rev I) These PCB have white colored connectors (see Fig. Fig. 3.7) for the gate wires and other internal connections. Remove the old PCB. Disconnect all cables from the terminals to. Discharge the tools and yourself by touching earth (if you are not earthed). 1. 7. Disconnect the voltage from terminals 1L1, 3L2 and 5L3 (main supply). 2. Connect the voltage and the other cable. Mount also the connector for Supply Voltage. Discharge the package with the new PCB by moving earth. DS Ready for start!! -. See Fig 6 9. Remove the front cover. Mount the cable the PCB from the thyristors, fans and thermal switch. 8. PS make sure that you are placing the jumper for supply voltage the correct position, 110 120V 220 240V.12. Disconnect the cable the PCB from the thyristors, fans and thermal switch. 10. Mount the front cover. Mount the new PCB. 11. 4. 5. This part valid replacing broken PCB with new PCB with the same revision newer, Step step