ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 19 z 79







Poznámky redaktora
1.7) for the gate wires and other internal connections. Disconnect the cable the PCB from the thyristors, fans and thermal switch.Start here if Replacing PCB marked Rev later (also for 690V Rev I) These PCB have white colored connectors (see Fig. 4. 3. 2. This part valid replacing broken PCB with new PCB with the same revision newer, Step step. 8. Discharge the package with the new PCB by moving earth. Mount the cable the PCB from the thyristors, fans and thermal switch. Connect the voltage and the other cable. Disconnect all cables from the terminals to. 10. 7. Mount the new PCB. New PCB rev I or later. Discharge the tools and yourself by touching earth (if you are not earthed). DS Ready for start!! -. Fig. 5. Remove the old PCB.12. Disconnect the voltage from terminals 1L1, 3L2 and 5L3 (main supply). 11. Remove the front cover. Mount the front cover. 6. Mount also the connector for Supply Voltage. PS make sure that you are placing the jumper for supply voltage the correct position, 110 120V 220 240V. See Fig 6 9