ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 19 z 79







Poznámky redaktora
6. Fig.7) for the gate wires and other internal connections. 11. Disconnect all cables from the terminals to.Start here if Replacing PCB marked Rev later (also for 690V Rev I) These PCB have white colored connectors (see Fig. Mount the front cover.12. Discharge the tools and yourself by touching earth (if you are not earthed). 4. 1. 3. 10. Disconnect the cable the PCB from the thyristors, fans and thermal switch. Mount also the connector for Supply Voltage. New PCB rev I or later. This part valid replacing broken PCB with new PCB with the same revision newer, Step step. 7. PS make sure that you are placing the jumper for supply voltage the correct position, 110 120V 220 240V. See Fig 6 9. Mount the new PCB. Disconnect the voltage from terminals 1L1, 3L2 and 5L3 (main supply). DS Ready for start!! -. 2. Remove the old PCB. 8. Discharge the package with the new PCB by moving earth. 5. Mount the cable the PCB from the thyristors, fans and thermal switch. Remove the front cover. Connect the voltage and the other cable