ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 17 z 79







Poznámky redaktora
Please note that the gate wires are connected differently the new PCB. Then all the internal cable connectors have converted fit the new PCB. 6. These PCB have tabs (see Fig connectors for the gate wires and other internal connections. Please note that the gate wires have new connection position - See colour marking Fig. Mount also the connector for Supply Voltage. Disconnect the cable the PCB from the thyristors, fans and thermal switch. Step step. 9. Disconnect the voltage from terminals 1L1 3L2 and 5L3 (main supply). Remove the front cover. Discharge the tools and yourself by touching earth (if you are not earthed). 11. Fig. Disconnect all cables from the terminals 1 3. Mount the front cover. New PCB rev I or later. 4. Mount the cable the PCB from the thyristors, fans and thermal switch. 7. This chapter valid replacing the broken PCB with the newest revision (rev later) PCB. Discharge the package with the new PCB by moving earth. Make also sure that you have connect the cable from the thyristors correct DS Ready for start!! -. The needed connectors are enclosed in the new PCB package.Start here if Replacing older PCB marked Rev older (for 690V Rev older). 1. 4. 2. 5. Cut the old wires, and exchange the terminals for the gate wires, fan wires, and thermal switch the new ones included in the package. 12. 10. Remove the old PCB. Connect the voltage and the other cable. PS make sure that you are placing the jumper for supply voltage the correct position, 110 120V 220 240V. Mount the new PCB. 8