ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 17 z 79







Poznámky redaktora
The needed connectors are enclosed in the new PCB package. 7. 11. Discharge the tools and yourself by touching earth (if you are not earthed). Mount the cable the PCB from the thyristors, fans and thermal switch. Discharge the package with the new PCB by moving earth. Please note that the gate wires have new connection position - See colour marking Fig. 12. 9. Mount the front cover. 1. 6. 4. 8. Disconnect all cables from the terminals 1 3. Cut the old wires, and exchange the terminals for the gate wires, fan wires, and thermal switch the new ones included in the package. 5. These PCB have tabs (see Fig connectors for the gate wires and other internal connections. Disconnect the voltage from terminals 1L1 3L2 and 5L3 (main supply). Remove the old PCB. Make also sure that you have connect the cable from the thyristors correct DS Ready for start!! -. 2. Remove the front cover. Mount the new PCB. Then all the internal cable connectors have converted fit the new PCB. Please note that the gate wires are connected differently the new PCB. 10. Step step. Mount also the connector for Supply Voltage.Start here if Replacing older PCB marked Rev older (for 690V Rev older). Fig. This chapter valid replacing the broken PCB with the newest revision (rev later) PCB. Disconnect the cable the PCB from the thyristors, fans and thermal switch. 4. New PCB rev I or later. PS make sure that you are placing the jumper for supply voltage the correct position, 110 120V 220 240V. Connect the voltage and the other cable