ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 17 z 79







Poznámky redaktora
Cut the old wires, and exchange the terminals for the gate wires, fan wires, and thermal switch the new ones included in the package. Disconnect the cable the PCB from the thyristors, fans and thermal switch. 10. 7. 11. Discharge the tools and yourself by touching earth (if you are not earthed). These PCB have tabs (see Fig connectors for the gate wires and other internal connections. Connect the voltage and the other cable. Mount the front cover. 1. The needed connectors are enclosed in the new PCB package. 5. Mount the cable the PCB from the thyristors, fans and thermal switch. 4. New PCB rev I or later. This chapter valid replacing the broken PCB with the newest revision (rev later) PCB. Mount also the connector for Supply Voltage. 6. Discharge the package with the new PCB by moving earth. 9. 8. Then all the internal cable connectors have converted fit the new PCB. Mount the new PCB. Fig. 12. 2. Make also sure that you have connect the cable from the thyristors correct DS Ready for start!! -. 4. Step step. PS make sure that you are placing the jumper for supply voltage the correct position, 110 120V 220 240V. Please note that the gate wires have new connection position - See colour marking Fig. Disconnect the voltage from terminals 1L1 3L2 and 5L3 (main supply). Disconnect all cables from the terminals 1 3. Please note that the gate wires are connected differently the new PCB.Start here if Replacing older PCB marked Rev older (for 690V Rev older). Remove the old PCB. Remove the front cover