207
www. Depending their function, they must provided
with captive marking. These VDE regulations mandate that every
neutral conductor must provided with disconnection
device so, e.
WAGO N-disconnect terminal blocks meet this require-
ment.
.
Touch-proof N-busbar via inserted separator plate
N-conductor disconnect terminal blocks
For the construction and operation power installations
in fire-prone, hazardous locations public buildings –
such conference centers, stores, hospitals, schools,
theaters hotels the DIN VDE 0100-710 DIN VDE
0100-718 standards shall observed., insulation testing possible for every
circuit without disconnecting the N-conductor.
WAGO’s power distribution disconnect terminal blocks
meet these requirements.wago.5 mm² “s+f-st”
Push-in termination: 1.g. Furthermore, all
equipotential bonding conductors must connected to
the potential equalization busbar and clearly arranged so
they can disconnected individually and accessed any
time.
Inserting the separator plate into the busbar carrier to
protect the N-busbar against accidental contact.75 2.25 mm² “s+f-st”
Push-in termination: 0.5 mm²
“insulated ferrules, mm”
3 Conductor range: 0.wago.5 mm² “s+f-st”, mm²
“f-st”;
Push-in termination: 2.75 mm² “s”
and 0. DIN VDE 0100-
482 shall also observed for fire-prone, hazardous
locations.5 mm² “s”
and 1.com
Rail-Mount Terminal Blocks, TOPJOB® S
Installation Rail-Mount Terminal Blocks, TOPJOB® S
Installation
Busbar Carrier
1 Conductor range: 0.
Inserting separator plate removed from N-disconnect
terminal block.5 mm² “s”
and 2.5 mm²
“insulated ferrules, mm”
2 Conductor range: 0. The potential
equalization busbar and the protective ground conductor
busbar must mounted common housing and be
connected each other using disconnectable copper
conductor minimum mm² AWG).5 mm²
“insulated ferrules, mm”
4 250 rated voltage
4 rated impulse voltage
3 pollution degree
“ Approvals and corresponding ratings,
visit www.com
Removing the separator plate from the busbar carrier or
from the N-disconnect terminal block.
Power distribution disconnect terminal blocks
According DIN VDE 0100-710, “Requirements for
operating facilities, rooms and special installations –
medical facilities,” equipotential bonding conductors shall
be run potential equalization busbar