g. The remaining piece insulation will meet require-
ments for clearances and creepage distances.
make sure that only one contact lug contact with the
terminal block.com
Rail-Mount Terminal Blocks, TOPJOB® S
Rail-Mount Terminal Blocks, TOPJOB® S
Technical Data
400 V/6 kV/3
IN A
TOPJOB® 2002 Series
Staggered Jumper
Staggered jumper; insulated; for 2002, 2003 and 2022
Series Rail-Mount Terminal Blocks; light gray
Item No.
Staggered jumper (seven contacts)
Individual jumper contacts can broken off bending
them.
Custom staggered jumpers can created, e.148
www.wago.
.
The contact lugs the customized staggered jumpers
contact the terminal blocks via the gaps created the
second jumper.
Staggered Jumper
Marking with felt-tip pen. Pack. Insert and press the ready-made jumper
assembly into the jumper slot until hits backstop.
The contact lugs the customized staggered jumpers
contact the terminal blocks via the gaps created the
second jumper.
make sure that only one contact lug contact with the
terminal block., for
bridging over terminal block with different potential. Unit
2-way 2002-472 25
3-way 2002-473 25
4-way 2002-474 25
5-way 2002-475 25
6-way 2002-476 25
7-way 2002-477 25
8-way 2002-478 25
9-way 2002-479 25
10-way 2002-480 25
11-way 2002-481 25
12-way 2002-482 25
Customized staggered jumper; insulated; with contact
lugs broken off the factory and circuit printing; 25
A; light gray
1-3 2002-473/011-000 25
1-3-5 2002-475/011-000 25
1-3-5-7 2002-477/011-000 25
1-3-5-7-9 2002-479/011-000 25
1-3-5-7-9-11 2002-481/011-000 25
Commoning using staggered jumpers
by bending them.
Commoning two potentials one single jumper slot via
extremely slim staggered jumpers.
Custom staggered jumpers can created, e., for
bridging over terminal block with different potential.
Insert staggered jumper and push down until hits
backstop.g.
Staggered jumpers (seven contacts)
Locate red stripes the staggered jumpers the inside. Insert and press the ready-made jumper
assembly into the jumper slot until hits backstop.
Removing staggered jumper:
Insert the operating tool between the staggered jumpers,
then lift the jumper. The remaining piece insulation
will meet requirements for clearances and creepage
distances.
Staggering jumpers single jumper slot