The Lighting Handbook ZG

| Kategorie: Firemní tiskovina  | Tento dokument chci!

Vydal: ZG Lighting Czech Republic s.r.o

Strana 153 z 244







Poznámky redaktora
several fire compartments are supplied from the ONLITE central eBox SUB E60, the power cable must be installed fireproof manner the cabinet, and the ­ final circuits the fire compartments supplied each case.153 The Lighting Handbook EL1 EN1 PE DA DA EL1 EN1 PE EL1 EN1 PE Cable entry from substation to main station ONLITE central eBox The 5-pole power cable must installed a FP cable the place installation the ONLITE central eBox SUB station the re- spective fire compartment. The system bus may executed lin- ear manner star ­ topology. Fireproof installation not required, since the monitor- ing the bus ensured through heartbeat control. Three SUB stations are available – ONLITE central eBox SUB E60 Standard SUB station used final circuits different fire compartments are served – ONLITE central eBox SUB E00 Standard SUB station E00 IP20 to supply final circuits without crossing any fire compartment – ONLITE central eBox SUB IP65 Standard SUB station E00 IP65 to supply final circuits without crossing any fire compartment for rough environments such industry, car parks under- ground parking . account interruption or short-circuit, any logging data arrive late or not all, emergency operation all lumi­ naires activated the final ­ circuit