Topics Resources Log In
Electrification
Getting the Grid and Charging Infrastructure
Ready for Heavy-Duty Electric Trucks
Amber Putignano
Tuesday, December 2025 SHARE:
The dawn electric semitrucks
and other medium- and heavy-
duty commercial vehicles has
arrived, and the technology is
going widely adopted, we
have come grips with what
this means for our electrical
infrastructure. and Europe. Grid stability will need real-
time balancing supply and demand.
More Electric Trucks the Road
.
High-speed charging for heavy-
duty electric vehicles (EVs) isn’t like charging car. The power demand is
multiples higher and requires thoughtful grid planning and careful
management peak power and power fluctuations avoid voltage drops,
frequency deviations, and potential blackouts.
COMMENTARY
Truck developers, utility companies, and technology companies are working
to overcome these challenges.S. Medium-
and heavy-duty vehicles are large sources greenhouse gas emissions in
both the U. There’s lot riding getting the charging
infrastructure right help make transportation more sustainable