5A 2. (factory default) P. Pre-alarm*
P.O. push
buttons
“Test” method:
(assuming unit the non-tripped state)
Press once trip the
unit
Press “Test” button
to trip the unit
(connected to
terminals and 3)
“Reset” method:
(assuming unit the tripped state and fault
current cleared)
Press once reset the
unit
Press “Reset” button
to reset the unit
(connected to
terminals and 2)
Minimum trigger time: >∆t >80ms setting
(only applicable to
remote “Test”)
Auto-reset
To enable: Via app
Auto-reclosure
To enable and adjust parameters: Via app only
Reclosure attempts: Selectable between and 10
(factory default 6)
Time between reclosure attempts (tr): after first attempt which doubles after each
attempt i.O.tele-online. (factory default)
S. P.
*Relay energises when Pre-alarm threshold is
exceeded
(factory default 50% I∆n.5, 7.ELR01PN ELR30PN Earth Leakage Relay (Type with NFC Technology
TELE_ELR_PN-1-A_DS www.
Output
Relay (RLY1) Relay (RLY2)
Terminals: 12, 13, 10, 11
Contact arrangement: SPDT SPNO
AC1 (250V) (2000VA) (2000VA)
AC15 (250V) 2. Options are: 1,
2.5 and 10s
(factory default 7.O.com Page 13
Manual Test and Reset
Front push button
Remote N. Threshold can be
changed via app)
Temperature rating
Operating: -20 +60°C
Storage: -30 +70°C
Relative humidity: +95% max.O.
S. S.S.S.5A
DC1 (25V) (200W) (200W)
. Positive Safety Output
(relay normally energised)
S.O.O. Standard Output
(relay normally de-energised)
P.O.O.e.O.5s)
Timeout: Selectable between and 20mins
(factory default 15mins)
Relay operational mode (assuming factory default settings used)
To change operation: Via app only
RLY1 RLY2
Key (assuming non-tripped state):
S.S.O. 2tr, tr, tr, etc.S