BERKER Wiring accessories + Building automation catalogue 2012

| Kategorie: Katalog  | Tento dokument chci!

The use of innovations and new technologies at Hageris always customer-driven. Every year, Hager evaluatesthousands of its customer contacts, resulting in detailedknowledge of its customers’needs in order to workefficiently and successfully.

Vydal: HAGER ELECTRO s.r.o. Autor: EN HAGER

Strana 541 z 616

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
minutes Up min. (BK) black: (phase) (BU) blue: (neutral conductor) (BR) brown: (relay, lamp cable) Note: When using energy saving lamps, consider high inrush currents. To prevent the lighting from remaining when there continuous movement the detection range (e. Limit cut-out Once the Berker control unit has switched on, the brightness longer evaluated. 0185. When switching back on, "S1" activates switching operation the Berker control unit for the pre-set delay time. connected load. long movement detected Berker control unit, the lighting remains on.5 sec. The delay time restarted every time movement detected in the relevant Berker control unit. after dawn), the unit fitted with limit cut-out. Pressing repeatedly additional functions. activates non-brightness-dependent switching operation for the pre-set delay time. Controller operation/CONTINUOUSLY ON The "S" switch allows changeovers between controller operation and CONTINUOUSLY ON. Electrical connections Connections executed plug-in terminals. When the Berker control unit switched and CONTINUOUSLY set, the neon lamp unit lights up. S1 closed, closed: CONTINUOUSLY ON S1 closed open: controller operation Switch-on timer Timer programmed switch-on the controller. Auto/manual operation with series switch S1 open, open: all off. Parallel connection does not increase the max. activates non-brightness-dependent switching operation for the pre-set delay time. cut-out The Berker control unit thus cuts out after minutes the latest, even there is continuous movement the detection field. Press 2x: the Berker control unit switches for hours, then brightness-dependent controller operation. The delay time (time which the light remains after more movement detected) shortened depending the overall time. Operation timer flash relay Extension delay time operation clock relay (e. 0. sec. Pressing repeatedly additional functions. Terminating outlet The terminating outlet the Berker control unit fitted with cable glands, for custom cable entries from above, below, left, right and rear. On time Delay time Up min. sec. for flash circuit). The delay time determined the Berker control unit with the longest remaining time. L BK N BU μ BR L N μ 60 88,3 103 52,7 37,9 T T N L L N T N L L N S S N L L N S N L L N S N L L N S1 S2 N L L N S1 S2 N L L N T N L L N N L L N Auto manual mode with 3-step switch 1 Controller operation 2 All Off 3 CONTINUOUS ONS N L L N 1 3 Berker control . Up min. Pressing the push-button once for min. Operation relay contact maker For potential-free and contacts and increase switching capacity. switched back the brightness falls below the pre-set value and there movement. Controller operation/CONTINUOUSLY ON changeover switching The "S" switch allows changing over between controller operation and CONTINUOUSLY ON. Pressing the push-button once for min. Set time Up min. Suppressor Order no. expires only when more movement detected. sec. sec. Parallel circuit with automatic staircase lighting switch remote control switch Lighting switched automatic units Berker control units. Connection multiple Berker control units "with intelligent load linking" Caution: All parallel connected Berker control units must run the same phase. necessary use inrush current limiter order no.g. minutes Up min. activates non-brightness-dependent switching operation for the set delay time. No switching operation the Berker control unit is performed, because only the load switched off. Additional functions The Berker control unit permits different operating modes, using push-button (NC) in the lead cable: Press 1x: non-brightness-dependent switch-on for the pre-set delay time, then brightness-dependent controller operation. Before installing the terminating outlet, open the two condensate drains the bottom (do not this if installing dusty rooms). The built-in microprocessor conjunction with a voltmeter the load cable means that all parallel connected Berker control units detect the switching light. seconds when a movement detected.T24 Changeover switching Existing changeover switches can replaced by push-button "T" (NO). With push-button (NO) Pressing push-button "T" (NO) once for min. Switch off Using "S1" "S2" switch. With push-button (NC) Existing switches can replaced push-button "T". min.g. This makes possible construct controller system comprising units with equal rights, with mutual interference. The Berker control unit switches for approx. "S2" does not this, only the load is switched off. Up min. For timer programmed switch-on the Berker control unit non-brightness-dependent switching operation is executed for the pre-set delay time. 0123 N L T Intelligent load linking N L L N L N N L L N N L L N T N L L N Switch-on timer Timer programmed activation and shutdown the Berker control unit. Press 4x: test mode: brightness evaluation disabled. Press 3x: the Berker control unit switches off for hours, then brightness-dependent controller operation. 90 min. Controller operation (monitoring)/ CONTINUOUSLY ON The "S" switch allows changeovers between controller operation and CONTINUOUSLY ON