Usměrňovačové systémy DC-Měniče Střídače UPS systémy ...
Poznámky redaktora
g. Ua
Safety extra-
low voltage
IPE 1RE current
Back Setup Meas.
ILeak
Device leakage
current
Back Setup Meas. Val.
RInsu-2 Jsec.. |
Menu, VDE 0701-0702 (protection class I)
30 :59 7
RPE
PE resistance
PLeak
Patient leakage
current
RInsu-1
Insulation test
LN-PE Funct.test body _Cable
_ Ilnsulation test
RInsu-3 LN-sec.ly Funct-
_ Ilnsulation test . iDevice leakage
ILeak [lllrent
Back Setup Meas. test body Funct.
10.1 evices ith ctio las I)
P rotection class evices ith pro tective nnection
3 7/2 0
ICont
09:58 2
Contact current
-unctional test
Continuity test
Safety extra
ow voltage
|Insulation test _
RInsu-1 |LN. open switch), information message displayed. Confirm with
<O continue with the test! For manual measurement, the individual tests measurements can
be carried out any order. Val. this screen, possible make all device settings (see chapter "Com
missioning Setup").
to VDE 0701-0702 (Class I)
130/07/2010 09:57:37
RPE 1PE resistance
ICont jContact current
R 1Insulation test
LN Funct. Val.BENNING BENNING 750 A
10. Only after troubleshooting, the test can be
repeated right from the beginning. VDE 0701-0702" "Test
acc. The test duration determined the time between the actuations the
<S tart>/ button.-PE able
R Insulating resistance LN-sec.
R Insulating resistance sec. VDE 0751" can selected pressing the corresponding button. jFunctional test
RInsu-2 1Insulation test
sec. Press get
to the setup screen. After
a positive connection test, the measurement started.
For the first test measurement, the tester starts connection test determine, whether dangerous
contact voltage applied, whether test sample connected and that there short-circuit.-PE able
R Insulating resistance prim.
Press call the help function.
.
R Insulating resistance sec.
. About
30 0
PLeak
09 :59 7
3atient leakage
current
-unctional test
Continuity test
Ilnsulation test _
"i™ |LrJ-test l.-PE Cable
Continuity test
RInsu-3 1Insulation test
LN-sec. Ua
IPE Protective conductor current
Contact current
Functional test
Continuity test
Safety extra-low voltage
S ele ctio individual rem (tests acco 0751):
R Protective conductor resistance Leak
R Insu-1 Insulating resistance prim. Ilnsulation test .4. Ua
Back Setup Meas.
RInsu-2 bod, cable
„ Ilnsulation test
RInSU-3 LN-sec. exception the measurement the protective conductor resistance
with Here, the switch-on time automatically limited seconds due thermal reasons.2 evices ith tectio clas II)
P rotection clas II: evices ith tec tive cto nnection
Incorrect measured values can deleted pressing the ese button.4.
S ele ctio individual rem (tests acco 0701-0702):
A Attention! Pressing the se> button will stop the measurement.
Another connection test will only started when the "Visual Inspection" menu has been passed
through once again. the test cable
with the alligator clip probe tip can connected another measuring point without resulting in
incorrect measurements indications. During the pause,
the test socket will remain live!
R Protective conductor resistance t
R Insu-1 Insulating resistance LN-PE Funct. Normally, however, the order the individual measurements (tests) has
to observed absolutely (see chapter 11, "Standard Test Procedures"), because the measurement
has stopped immediately case failed test.-PE Funct. About
Menu, VDE 0751 (protection class I)
After having entered the protection class, the "Visual Inspection" menu displayed.o. About
Menu, VDE 0701-0702 (protection class II) Menu, VDE 0751 (protection class II)
08/ 2012 58
.
IL Device leakage current
Patient leakage current
Functional test
Continuity test
10.
In case negative connection test (e...g.-PE Cable
Continuity test
RInsu-3
Insulation test
LN-sec.
Functional test
RInsu-2
Insulation test
sec.
By pressing the button, possible interrupt measurement that e.-sec.4 anu Tests acco -0702 0751
On the main screen, the individual tests measurements Test acc