Functional test
RInsu-2
Insulation test
sec. the test cable
with the alligator clip probe tip can connected another measuring point without resulting in
incorrect measurements indications.
For the first test measurement, the tester starts connection test determine, whether dangerous
contact voltage applied, whether test sample connected and that there short-circuit. jFunctional test
RInsu-2 1Insulation test
sec. Ua
Back Setup Meas.4 anu Tests acco -0702 0751
On the main screen, the individual tests measurements Test acc.-PE Funct. Only after troubleshooting, the test can be
repeated right from the beginning.-PE able
R Insulating resistance prim. test body Funct.
ILeak
Device leakage
current
Back Setup Meas. Ua
Safety extra-
low voltage
IPE 1RE current
Back Setup Meas.g. exception the measurement the protective conductor resistance
with Here, the switch-on time automatically limited seconds due thermal reasons.-PE Cable
Continuity test
RInsu-3 1Insulation test
LN-sec.. Val. |
Menu, VDE 0701-0702 (protection class I)
30 :59 7
RPE
PE resistance
PLeak
Patient leakage
current
RInsu-1
Insulation test
LN-PE Funct. About
Menu, VDE 0701-0702 (protection class II) Menu, VDE 0751 (protection class II)
08/ 2012 58
.
Another connection test will only started when the "Visual Inspection" menu has been passed
through once again.BENNING BENNING 750 A
10. Val.1 evices ith ctio las I)
P rotection class evices ith pro tective nnection
3 7/2 0
ICont
09:58 2
Contact current
-unctional test
Continuity test
Safety extra
ow voltage
|Insulation test _
RInsu-1 |LN. Confirm with
<O continue with the test! For manual measurement, the individual tests measurements can
be carried out any order.
. Val.
Press call the help function.-sec. iDevice leakage
ILeak [lllrent
Back Setup Meas.
10.
IL Device leakage current
Patient leakage current
Functional test
Continuity test
10.
RInsu-2 Jsec.4.
By pressing the button, possible interrupt measurement that e. Ilnsulation test .-PE able
R Insulating resistance LN-sec.
R Insulating resistance sec. Press get
to the setup screen.o. Normally, however, the order the individual measurements (tests) has
to observed absolutely (see chapter 11, "Standard Test Procedures"), because the measurement
has stopped immediately case failed test. Ua
IPE Protective conductor current
Contact current
Functional test
Continuity test
Safety extra-low voltage
S ele ctio individual rem (tests acco 0751):
R Protective conductor resistance Leak
R Insu-1 Insulating resistance prim.
. About
30 0
PLeak
09 :59 7
3atient leakage
current
-unctional test
Continuity test
Ilnsulation test _
"i™ |LrJ-test l. The test duration determined the time between the actuations the
<S tart>/ button.
In case negative connection test (e.ly Funct-
_ Ilnsulation test .-PE Cable
Continuity test
RInsu-3
Insulation test
LN-sec. VDE 0701-0702" "Test
acc.
S ele ctio individual rem (tests acco 0701-0702):
A Attention! Pressing the se> button will stop the measurement.
RInsu-2 bod, cable
„ Ilnsulation test
RInSU-3 LN-sec. VDE 0751" can selected pressing the corresponding button. During the pause,
the test socket will remain live!
R Protective conductor resistance t
R Insu-1 Insulating resistance LN-PE Funct.
R Insulating resistance sec.
to VDE 0701-0702 (Class I)
130/07/2010 09:57:37
RPE 1PE resistance
ICont jContact current
R 1Insulation test
LN Funct. After
a positive connection test, the measurement started..2 evices ith tectio clas II)
P rotection clas II: evices ith tec tive cto nnection
Incorrect measured values can deleted pressing the ese button..g. open switch), information message displayed.4. About
Menu, VDE 0751 (protection class I)
After having entered the protection class, the "Visual Inspection" menu displayed.test body _Cable
_ Ilnsulation test
RInsu-3 LN-sec. this screen, possible make all device settings (see chapter "Com
missioning Setup")