BENNING produkty

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Usměrňovačové systémy DC-Měniče Střídače UPS systémy ...

Vydal: BENNING CR, s.r.o. Autor: BENNING

Strana 211 z 247

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
IL Device leakage current Patient leakage current Functional test Continuity test 10. For the first test measurement, the tester starts connection test determine, whether dangerous contact voltage applied, whether test sample connected and that there short-circuit. Ua Safety extra- low voltage IPE 1RE current Back Setup Meas.4. . Normally, however, the order the individual measurements (tests) has to observed absolutely (see chapter 11, "Standard Test Procedures"), because the measurement has stopped immediately case failed test. Only after troubleshooting, the test can be repeated right from the beginning.g.-PE Cable Continuity test RInsu-3 Insulation test LN-sec.4 anu Tests acco -0702 0751 On the main screen, the individual tests measurements Test acc. ILeak Device leakage current Back Setup Meas. VDE 0701-0702" "Test acc. Confirm with <O continue with the test! For manual measurement, the individual tests measurements can be carried out any order. During the pause, the test socket will remain live! R Protective conductor resistance t R Insu-1 Insulating resistance LN-PE Funct. Val.o. RInsu-2 Jsec. to VDE 0701-0702 (Class I) 130/07/2010 09:57:37 RPE 1PE resistance ICont jContact current R 1Insulation test LN Funct.. Val.-sec.. R Insulating resistance sec.g. In case negative connection test (e. By pressing the button, possible interrupt measurement that e. VDE 0751" can selected pressing the corresponding button. Functional test RInsu-2 Insulation test sec.test body _Cable _ Ilnsulation test RInsu-3 LN-sec. the test cable with the alligator clip probe tip can connected another measuring point without resulting in incorrect measurements indications. Ua Back Setup Meas. Press get to the setup screen.ly Funct- _ Ilnsulation test .-PE able R Insulating resistance prim. jFunctional test RInsu-2 1Insulation test sec. About Menu, VDE 0701-0702 (protection class II) Menu, VDE 0751 (protection class II) 08/ 2012 58 . | Menu, VDE 0701-0702 (protection class I) 30 :59 7 RPE PE resistance PLeak Patient leakage current RInsu-1 Insulation test LN-PE Funct. iDevice leakage ILeak [lllrent Back Setup Meas.-PE able R Insulating resistance LN-sec. S ele ctio individual rem (tests acco 0701-0702): A Attention! Pressing the se> button will stop the measurement.1 evices ith ctio las I) P rotection class evices ith pro tective nnection 3 7/2 0 ICont 09:58 2 Contact current -unctional test Continuity test Safety extra ow voltage |Insulation test _ RInsu-1 |LN. this screen, possible make all device settings (see chapter "Com­ missioning Setup"). RInsu-2 bod, cable „ Ilnsulation test RInSU-3 LN-sec. R Insulating resistance sec. .BENNING BENNING 750 A 10. exception the measurement the protective conductor resistance with Here, the switch-on time automatically limited seconds due thermal reasons.2 evices ith tectio clas II) P rotection clas II: evices ith tec tive cto nnection Incorrect measured values can deleted pressing the ese button. open switch), information message displayed. Ilnsulation test .4. Val. test body Funct. About Menu, VDE 0751 (protection class I) After having entered the protection class, the "Visual Inspection" menu displayed.-PE Cable Continuity test RInsu-3 1Insulation test LN-sec. Another connection test will only started when the "Visual Inspection" menu has been passed through once again. The test duration determined the time between the actuations the <S tart>/ button.-PE Funct. 10.. Ua IPE Protective conductor current Contact current Functional test Continuity test Safety extra-low voltage S ele ctio individual rem (tests acco 0751): R Protective conductor resistance Leak R Insu-1 Insulating resistance prim. Press call the help function. About 30 0 PLeak 09 :59 7 3atient leakage current -unctional test Continuity test Ilnsulation test _ "i™ |LrJ-test l. After a positive connection test, the measurement started