Usměrňovačové systémy DC-Měniče Střídače UPS systémy ...
Poznámky redaktora
During the pause,
the test socket will remain live!
R Protective conductor resistance t
R Insu-1 Insulating resistance LN-PE Funct. About
Menu, VDE 0701-0702 (protection class II) Menu, VDE 0751 (protection class II)
08/ 2012 58
. open switch), information message displayed.BENNING BENNING 750 A
10.
Functional test
RInsu-2
Insulation test
sec.
In case negative connection test (e. About
Menu, VDE 0751 (protection class I)
After having entered the protection class, the "Visual Inspection" menu displayed.
RInsu-2 Jsec. VDE 0701-0702" "Test
acc. Ua
Safety extra-
low voltage
IPE 1RE current
Back Setup Meas. Val. Only after troubleshooting, the test can be
repeated right from the beginning.ly Funct-
_ Ilnsulation test . |
Menu, VDE 0701-0702 (protection class I)
30 :59 7
RPE
PE resistance
PLeak
Patient leakage
current
RInsu-1
Insulation test
LN-PE Funct.. Confirm with
<O continue with the test! For manual measurement, the individual tests measurements can
be carried out any order.
.4 anu Tests acco -0702 0751
On the main screen, the individual tests measurements Test acc.
RInsu-2 bod, cable
„ Ilnsulation test
RInSU-3 LN-sec.
Another connection test will only started when the "Visual Inspection" menu has been passed
through once again.
R Insulating resistance sec. After
a positive connection test, the measurement started..-PE Funct.
R Insulating resistance sec.
.
Press call the help function. Normally, however, the order the individual measurements (tests) has
to observed absolutely (see chapter 11, "Standard Test Procedures"), because the measurement
has stopped immediately case failed test.-PE Cable
Continuity test
RInsu-3 1Insulation test
LN-sec.
ILeak
Device leakage
current
Back Setup Meas.1 evices ith ctio las I)
P rotection class evices ith pro tective nnection
3 7/2 0
ICont
09:58 2
Contact current
-unctional test
Continuity test
Safety extra
ow voltage
|Insulation test _
RInsu-1 |LN. The test duration determined the time between the actuations the
<S tart>/ button.
IL Device leakage current
Patient leakage current
Functional test
Continuity test
10.
By pressing the button, possible interrupt measurement that e. Press get
to the setup screen.o.4.
S ele ctio individual rem (tests acco 0701-0702):
A Attention! Pressing the se> button will stop the measurement. Val. exception the measurement the protective conductor resistance
with Here, the switch-on time automatically limited seconds due thermal reasons. Ua
Back Setup Meas. Val.2 evices ith tectio clas II)
P rotection clas II: evices ith tec tive cto nnection
Incorrect measured values can deleted pressing the ese button. test body Funct.
to VDE 0701-0702 (Class I)
130/07/2010 09:57:37
RPE 1PE resistance
ICont jContact current
R 1Insulation test
LN Funct. Ilnsulation test .g.
For the first test measurement, the tester starts connection test determine, whether dangerous
contact voltage applied, whether test sample connected and that there short-circuit. iDevice leakage
ILeak [lllrent
Back Setup Meas.-PE Cable
Continuity test
RInsu-3
Insulation test
LN-sec.test body _Cable
_ Ilnsulation test
RInsu-3 LN-sec.-PE able
R Insulating resistance prim. jFunctional test
RInsu-2 1Insulation test
sec.. About
30 0
PLeak
09 :59 7
3atient leakage
current
-unctional test
Continuity test
Ilnsulation test _
"i™ |LrJ-test l. this screen, possible make all device settings (see chapter "Com
missioning Setup"). Ua
IPE Protective conductor current
Contact current
Functional test
Continuity test
Safety extra-low voltage
S ele ctio individual rem (tests acco 0751):
R Protective conductor resistance Leak
R Insu-1 Insulating resistance prim.-PE able
R Insulating resistance LN-sec.
10.4.g. the test cable
with the alligator clip probe tip can connected another measuring point without resulting in
incorrect measurements indications.-sec. VDE 0751" can selected pressing the corresponding button