Poznámky redaktora
Set the megger 500V.Discharge the tools and yourselfby touching earth (ifyou
are not earthed).
Mark the cables from the thyristors with L1, and L3.
Disconnect these six sets cables form the HV-board. Note the result
Repeat the tests the two remaining phases between Figure B
3L2 4T2 and 5L3 6T3.When ready you will have six
different values.
Please also check that all other cables, for the temperature sensor, fans etc. guide for good thyristor when the value above 1Mohm.
An analysis the test result from all three phases will show you have shorted ,
thyristor not.
Figure A
2T1
Change the connection according figure and repeat the
measurement.
When ready, please make sure that you reconnected the gate cables the same position before. are position, properly
connected (they may slide off during handling the plastic top).
If you need change thyristor thyristor block, please look the separate instructions for
changing thyristors.
Then you are Ready for start!!
-. There are different instructions depending both type and size of
softstarters. When
identified shorted has replaced with new one. Look for values, which are not line with the majority the thyristors, 2T1
showing lower value.
Connect the megger the main terminals the softstarter
1L1 and 2T1 according figure Note the result.
Mound the plastic top back position and finally, reconnect all control cables and the main cables