ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 13 z 79







Poznámky redaktora
There are different instructions depending both type and size of softstarters. An analysis the test result from all three phases will show you have shorted , thyristor not.When ready you will have six different values. Mark the cables from the thyristors with L1, and L3. When identified shorted has replaced with new one. Disconnect these six sets cables form the HV-board. Look for values, which are not line with the majority the thyristors, 2T1 showing lower value. If you need change thyristor thyristor block, please look the separate instructions for changing thyristors.Discharge the tools and yourselfby touching earth (ifyou are not earthed). guide for good thyristor when the value above 1Mohm. Set the megger 500V. are position, properly connected (they may slide off during handling the plastic top). Then you are Ready for start!! -. Please also check that all other cables, for the temperature sensor, fans etc. Figure A 2T1 Change the connection according figure and repeat the measurement. Mound the plastic top back position and finally, reconnect all control cables and the main cables. Connect the megger the main terminals the softstarter 1L1 and 2T1 according figure Note the result. Note the result Repeat the tests the two remaining phases between Figure B 3L2 4T2 and 5L3 6T3. When ready, please make sure that you reconnected the gate cables the same position before