RELAYS Panasonic

| Kategorie: Katalog  | Tento dokument chci!

Panasonic is part of a large worldwide groupselling relays and associated switching products under different brand names in different territories.The conditions of use in some territories may differ from those customary in Europe. In particular there are often major differences in regard to national and international specifications, such as UL, CSA, VDE, SEV, EVE, SEMKO, etc. Thus, when considering contact loads as stated in this catalogue (e.g. 10 A, 30 VDC for the SP relay) its hould be understood that these values are not necessarily an absolute maximum but tested ratings. Mostly the stated value has been tested for a certain life expectancy as stated by the manufacturer or the respective test house. Thus, under different conditions, the stated “maximum” may, in practice, be safely exceeded.

Vydal: Panasonic Electric Works Czech s.r.o. Autor: Panasonic

Strana 834 z 1090

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
hile zero accidental failure rate desirable, this actually not practical the real world. The eibull probability chart sim pler alternative complex calculation formulas. The value the figure param eter represents the type of the failure. • The eibull probability chart easy to use. (III) ear-out failure period In the final stage the product's service lifetime comes the ear-out failure period, which the life the product expires due ear fatigue. In this period, called accidental failure period, failures occurs random along the tim axis. • hen Initial failures • hen Accidental failures • hen ear-out failures 632 ds_x61_en_relay_technical_information_091112D . (I) Initial failure period The high failure rate the initial failure period derived from latent design errors, process errors, and many other causes. [3] FAILURE 1. This process called debugging, performing aging or screening. 2. Preventive maintenance effective for this type of failure. (II) Accidental failure period The initial failure period followed a long period with low, stable failure rate. eibull distribution expressed the following equation: m Figure parameter a easurem ent param eter y Position parameter W eibull distribution can adopted the actual failure rate distribution the three variables above are estimated. Weibull Analysis W eibull analysis often used for classifying product's failure patterns and determine its lifetime. The use relay intended only the accidental failure period, and this period virtually represents the service lifetime of the relay. What Failure? Failure defined state system, equipment, com ponent which part of all its functions are impaired lost.Reliability 5. • Different types failures can be identified the chart. Failure rate high the beginning and end its service lifetime. 3. The timing relay's wear-out failure can predicted with certain accuracy from the past record uses. The chart provides the following advantages: • The eibull distribution has the closest proximity the actual lifetime distribution. given value which makes the following equation true: 1 R(B) % In general, “B[1 R(B)] 10%” more often used. some cases this represents more practical value of reliability than MTTF. Initial failures are screened at m anufacturer's site through burn-in process. The following describes the correlation with the bathtub curve. Safe Life Safe life inverse degree of reliability. Bathtub Curve Product's failure rate throughout its lifetime depicted bathtub curve, as shown below