PowerDIN 4PZ

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: HW group s.r.o.

Strana 24 z 80







Poznámky redaktora
change schedule, click Edit schedules. After selecting schedule, the on-times for the output according that schedule are shown graphically. After the changes are saved, the Scheduler not enabled/activated is currenty disabled. When it enabled, the outputs are set according the schedule. Figure Configuring the Schedule Scheduler output disabled Scheduler output enabled . The displayed schedule cannot changed the Output Schedule view. opens the main tab Schedules (details chapter Schedules). When the Scheduler function disabled, the outputs stay their current states.3 Outputs Schedule The Scheduler function can used switch the output and off specified times. the Scheduler enabled the current interval applied the output state may change according selected schedule.24 5. To enable disable the Scheduler for given output, click the Scheduler button next that output. Click Save Changes confirm the selected schedule. Select a schedule specify when the output should turned on.1