A HISTORY OF EDISON'S WEST ORANGE LABORATORY 1887-1931

| Kategorie: Kniha  | Tento dokument chci!

Vydal: Neurčeno

Strana 558 z 567

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.

Jak získat tento dokument?






Poznámky redaktora
" The process of testing and quality assurance had become long and complex one. Although the function the laboratory had moved from the driving force the Edison enterprise the 1880s an advisory role the 1920s, still played important part in quality assurance. Their work was monitored chief inspector and he, in turn, was under man from the laboratory, who double checked 3 2 the checkers and tested small sample the daily output.XIV-16 perfection every detail." the 1920s Edison was no longer around approve every machine leaving the laboratory for the Works. But normally was engineer from the main lab who had the last word. Edison in safeguarding the standards quality. But even when the "old man" was long gone, the engineering organization guided for long continued work in his image: "The Engineering Department represents Mr. Phonograph mechanisms, for example, were tested by staff inspectors special room the Phonograph Works. 30