A HISTORY OF EDISON'S WEST ORANGE LABORATORY 1887-1931

| Kategorie: Kniha  | Tento dokument chci!

Vydal: Neurčeno

Strana 338 z 567

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.

Jak získat tento dokument?






Poznámky redaktora
VIII-40 under one centralized control. In 1910 Edison made the decision install the lab an "engineering and experimental department" which was develop new machines from scratch and then send them the phonograph works for manufacture. was finally 57 . The Engineering Department was given charge production engineering: producing better designs for manufacture, and standardizing design after improvements had been made. Any change existing C O product had approved the new department. The next step was create department and give the support facilities enable operate independently. All new products had developed in the Engineering Department, avoid some expensive "mistakes" which had occurred the past. The new organization was set specifically work phonographs, and there was some discussion whether should put the payroll the National Phonograph Company. A very important function this department was work with the other engineering and works departments— was intended permanent link the chain development that began the laboratory and ended the shipping department the Works. This organization would present a working machine the executive committee for approval before it was turned over the drafting department for complete set blueprints made and sent the Works. The products the Engineering Department were models and blueprints new phonographs