A HISTORY OF EDISON'S WEST ORANGE LABORATORY 1887-1931

| Kategorie: Kniha  | Tento dokument chci!

Vydal: Neurčeno

Strana 30 z 567

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.

Jak získat tento dokument?






Poznámky redaktora
Building formed entrance gateway with the west end the main building, and the space between and Buildings and 2 formed courtyard. Leather belts took the power from the drive shafts the machines below. They complimented the work the main laboratory building, and their spatial relations with it defined the physical shape Edison's West Orange laboratory.14 manufacture Edison products. The laboratory was wired for electricity throughout and . The West Orange laboratory was organic structure which constantly changed meet the needs Edison's research, new buildings added and old ones refurbished. contained rock crushers and graders, assay furnaces, and containers for the many samples ore that Edison had collected. His new laboratory had open architecture which enabled him convert workspace and add buildings the need arose. These four satellite buildings indicate the experimental directions that Edison intended follow: electricity, chemistry, and metallurgy. The five main buildings were completed September, and Batchelor then turned his attention fitting out the laboratory. followed the current industrial practice in establishing power house one end the main laboratory building and running shafts along the two first floors. They are physical proof Edison's habit break down experimental problems into electrical, chemical, and material parts. The last the satellite buildings, number was established metallurgical laboratory