Harting Sbírka katalogů říjen 2013

| Kategorie: Katalog  | Tento dokument chci!

Vydal: HARTING s.r.o. Autor: HARTING

Strana 589 z 808

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
34. The optimum voltage level selected according the power draw and the length the transmission route. Two things happen the voltage transformation substation: the electric energy transformed between two more voltage levels, and sections line used for transm ission of the energy can itched off, e. Accessible and ergonomic The use HARTING connectors with standard protection class gas-insulated, etal-encapsulated switchgear not only fits perfectly with the modular design philosophy the system, but also offers good accessibility and ergonomics. For the safety personnel and plant components it absolutely essential these itches work reliably.y Plug Play under high voltage In order ensure low losses during transm ission the electrical energy from the power station the user, the energy transm itted several matched voltage levels. consequence, these connectors contribute the high availability the plant. for maintenance work the event faults.g. The switching process performed with the aid switches that can be operated under load so-called high-voltage power switches