S
L
1 -
Ul
■
CONNECTIVITY SOLUTIONS FOR SPECIFIC
BASE STATION REQUIREMENTS
A global supplier CDMA infrastructure equipment se
lected HARTING connectors solve specific problems it
had with its CDMA cellular Base Stations. HARTING utilized the HARTING Mini
Coax cable assemblies and the Han® housing and hood
to more than fulfil these requirements.
To bring low power signals from the Site Interface
Frame (SIF) the Modem Frame (MOPA) dust proof so
lution was required.
54 HARTING elecom unications
.5mm har-pak® digital connectors were
selected ensure that the cellular Base Transceiver Sys
tem (BTS) would have sigma board mating, allow RF
and digital signal interconnections integrated one
backplane and minimize cable routing that ensures
ease assembly and field service, well maintain a
clean appearance.
The HARTING Mini Coax connectors and cables and
the HARTING 2