ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 506 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
Power the unit ONLY from the PR030/B 3. To enter new password, select the "New Password" item the "Settings/System" menu. Disabling the Password. For the default password see par. there are other errors, the display will show the message Configuration (configuration error) accompanied the yellow LED com ing permanently (warning) 4. Select "Circuit-breaker' 6. Remove the PR123/P unit from the circuit-breaker 9. Vice versa, the PR123/P supplied separately, will the user set all the necessary parameters correctly. Enter the unit's "Settings" menu 3.3.4). The remove the connector, proceed indicated the figure alongside. When the red led flashes and off and the message Installation (installation error) displayed, remove the PR030/B 10.2 sta llin g To complete the procedure for uninstalling PR123/P unit, follow the steps below: 1. Power the relay from any other source Check for the absence configuration errors. 1 t Specify password? ***] To enter "EDIT" mode necessary enter four-figure numerical password. If the password wrong, the message W rong password appears and remains until the ESC key pressed (or until interval seconds has elapsed). 14. 95/158 .itia ttin s If the PR123/P supplied ready installed the circuit-breaker, ABB SACE set all the variables referring the circuit-breaker the specific application correctly (e. therefore always possible to switch from "READ" "EDIT". By setting the value the password [0000] (on the "Unit configuration" menu) the password prom disabled. Select "Unit installation' 7. the password correct, you from the "READ" state to the "EDIT" state. 1 tro relea se 1 lla tio n To complete the procedure for installing PR123/P unit, follow the steps below: 1. When the PR120/V module installed, user must properly set the, rated voltage. type circuit-breaker, Rating Plug size. Input the password 6. 14. Input the password 8. With the circuit-breaker open and preferably isolated, install the protection unit the circuit-breaker 2. Select "Uninstall" and press "ENTER" 7. The data question are then transmitted the new PR123/P unit installed on the same circuit-breaker.). Select "Unit installation" 5. Remove the PR030/B 8.4.. Model 2234 Apparatus Scale L2778 Doc 2 Page No.4. After entering the fourth figure, check the password you have entered. Enter the unit's "Settings" menu 5. It also possible interrupt the password entry procedure pressing the ESC key.. 14. With the circuit-breaker open and/or isolated power the unit from the PR030/B 2. It not strictly necessary complete the uninstalling procedure, but this enables the parameters relating the circuit-breaker, such contact wear and others, saved, otherwise these data would lost.g. Select "Install' and press "ENTER' 9. Select "Circuit-breaker 4. Select the value the first figure between '0' and '9' means the and keys and press confirm the figure and then move enter the next one. A part from this, absolutely indispensable for the user odify the password and carefully define each odifiable param eter, before putting the PR123/P into service. Note that ABB SACE defines each possible setting according the content the paragraph the default parameters (see par. The values attributable the password from 0000 9999.4.7