Poznámky redaktora
3. 11. and/or disconnected essages ust appear; they
do, not close the circuit-breaker ediately and make the correct connections.3. 2
Page No.
14.3. No. customer considers this value too
high has residual current protection which risks being tripped, then application diagram must used.3 Putting into service
14.
Pay particular attention the types cable, the connections earth and the recom ended axim distances.2).1 Current sensor connection for external neutral
A
If you rre xte tra irc it-b r,
rem InN. positive result shown the display.
A
A
The axim length the PR120/V iring ust not exceed meters.
The shield ust connected earth both sides. 15.7. With enabled, the Voltage Transformer Inpresent data will set and VT's phase-to-phase primary
and secondary voltage properly adjusted.
94/158
1/6
CB status
.
14. 14.1 ction s
A
For the connections provided the user, recom ended that you com ply strictly ith the recom endations contained
in this docum ent.
The following summary table standard connections according the type plant.
The VTs must have performance coming between the values and 20VA inclusive, insulation between the primary and
Installation system
"VT Standard" type transform er
(Star/Star)
"VT Standard" type transform er
(Delta/Delta)
Application diagram Application diagram
TN-C A
TN-S A
IT with neutral A
IT n.3 and connection test
A
If the PR123/P was installed the user, portant, before closing the CB, check the last line the display when the
relay turned for the first tim via PR030/B battery unit.
14.3.3.
Auto Test
Trip Test (disabled)
CBopen
Model 2234 Apparatus Scale
L2778
Doc.2).c A
TT with neutral A
TT without neutral n. rin irc it-b ope and ly
is .14.
VT Standard: Single standard transformers, see par.
Use VTs ith shield, connected earth (see standard par.
- for and systems with neutral, the connection must made N.2 connections
A ielectric strength tests are not allowed the inputs and outputs the releases the secondary lines any
c VTs.2.To run Trip Test, press the Test" button and the "Enter"
button simultaneously.1.
Use corded shielded o-w ire cable (see note par.3.
Check the open closed state the circuit-breaker the same "PR123/P Test" screen, checking that
the closed and de-energized.c A
Note for diagram:- for TN-C systems the connection must made PEN;
- for TN-S systems the connection must made for configurations with neutral for configurations without
neutral; the used, the current thereon could around dozen mA.
The VTs should only used for voltages 690V; for lower voltages the presence the PR120/V module connected the lower
or higher busbars will sufficient.
Then test can conducted the whole chain, again using the specific function (Trip test).This ill enable satisfy all the international reference standards and guarantee perfect operation of
the relay even under severe environm ental and electrom agnetic conditions.1. positive
result shown the circuit-breaker opening.
A pplication diagram pplication diagram B
N L3
f —
A1 bi
B1i «1
A2
B21
b2
^a2
A3
53^
b3
[ a3
it:::::::::
in i:::::::
H H
1>+ 1
14.4 Test
Before putting into service, test can conducted means the specific "Auto test" function which
can activated the PR123/P