ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 505 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
1 Current sensor connection for external neutral A If you rre xte tra irc it-b r, rem InN.3. rin irc it-b ope and ly is .3.7.To run Trip Test, press the Test" button and the "Enter" button simultaneously. - for and systems with neutral, the connection must made N. 14.2 connections A ielectric strength tests are not allowed the inputs and outputs the releases the secondary lines any c VTs. customer considers this value too high has residual current protection which risks being tripped, then application diagram must used.3 Putting into service 14.1. No. The following summary table standard connections according the type plant. Pay particular attention the types cable, the connections earth and the recom ended axim distances. VT Standard: Single standard transformers, see par.c A TT with neutral A TT without neutral n. 2 Page No. Auto Test Trip Test (disabled) CBopen Model 2234 Apparatus Scale L2778 Doc. Check the open closed state the circuit-breaker the same "PR123/P Test" screen, checking that the closed and de-energized. The VTs must have performance coming between the values and 20VA inclusive, insulation between the primary and Installation system "VT Standard" type transform er (Star/Star) "VT Standard" type transform er (Delta/Delta) Application diagram Application diagram TN-C A TN-S A IT with neutral A IT n.2. 15.4 Test Before putting into service, test can conducted means the specific "Auto test" function which can activated the PR123/P. and/or disconnected essages ust appear; they do, not close the circuit-breaker ediately and make the correct connections.2). Then test can conducted the whole chain, again using the specific function (Trip test). 94/158 1/6 CB status . 14.This ill enable satisfy all the international reference standards and guarantee perfect operation of the relay even under severe environm ental and electrom agnetic conditions. A A The axim length the PR120/V iring ust not exceed meters. positive result shown the circuit-breaker opening.2). A pplication diagram pplication diagram B N L3 f — A1 bi B1i «1 A2 B21 b2 ^a2 A3 53^ b3 [ a3 it::::::::: in i::::::: H H 1>+ 1 14. Use VTs ith shield, connected earth (see standard par. Use corded shielded o-w ire cable (see note par.3 and connection test A If the PR123/P was installed the user, portant, before closing the CB, check the last line the display when the relay turned for the first tim via PR030/B battery unit.14.3. The shield ust connected earth both sides.1 ction s A For the connections provided the user, recom ended that you com ply strictly ith the recom endations contained in this docum ent.c A Note for diagram:- for TN-C systems the connection must made PEN; - for TN-S systems the connection must made for configurations with neutral for configurations without neutral; the used, the current thereon could around dozen mA.3. 11. The VTs should only used for voltages 690V; for lower voltages the presence the PR120/V module connected the lower or higher busbars will sufficient.3. 14.1. 14. positive result shown the display. With enabled, the Voltage Transformer Inpresent data will set and VT's phase-to-phase primary and secondary voltage properly adjusted.3