ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 468 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
c A A A A 13.4 Test Before putting into service, test can conducted means the specific "Auto test" function which can activated the PR122/P.1 A Note for diagram for TN-C systems the connection must made PEN; - for TN-S systems the connection must made for configurations with neutral for configurationswithout neutral; the used, the current thereon could around dozen mA.3.2.3. 57/158 . and/or disconnected essages ust appear; they do, not close the circuit-breaker and ake the correct connections. data present and suitably adjust the phase-to-phase primary and secondary voltage the VT. The VTs must have performance coming between the values and inclusive, insulation between the primary and secondary. positive result shown the circuit-breaker opening. 13. Current sensor connection for external neutral If you rre xte tra circ it-b r, re InN rin irc it-b pen and ly is .1. This ill enable satisfy all the international reference standards and guarantee perfect operation the relay even under severe environm ental and electrom agnetic conditions. Installation system "VT tra r (S r/S r) "VT Standard" type transform er (Delta/Delta) Application diagram Application diagram TN-C A TN-S A IT with neutral A IT n.3.To run Trip Test, press the Test" button and the "Enter" button simultaneously. 2 Page No.7. positive result shown the display.— -A3 B3i b3 ^a3 N L3 ai +— 3 L “ H>+c: 13. 15. The axim length the PR120/V iring ust not exceed meters. 1 tio s Dielectric strength tests are not allowed the inputs and outputs the releases the secondary lines any connected VTs The following summary table standard connections according the type plant.3 utting into service 1 tio s For the connections provided the user, recom ended you com ply strictly ith the recom endations c t. A pplication diagram A L1 L3 A pplication diagram B A1 b1 B1i\ a1- HA2 b2 B2]^02 . The shield ust connected earth both sides.3 and connection test A If the PR122/P was installed the user, portant, before closing the CB, check the last line the display when the relay turned for the first tim via PR030/B battery unit.2). customer considers this value too high or has residual current protection which risks being tripped, then application diagram must used; - for and systems with neutral, the connection must made N. 13. VT (A): Single standard transformers, see par. Then test can conducted the whole chain, again using the specific function (Trip test). Check the open closed state the circuit-breaker the same "PR122/P Test" screen, checking that closed and de-energized.c A TT with neutral A TT without neutral n. 11. With available, set the Voltage Transf. Pay particular attention the types cable, the connections earth and the recom ended axim distances.1. The VTs should only used for voltages 690V; for lower voltages the presence the PR120/V module connected the lower or higher busbars will sufficient. T 1/6 C s A t T rip ) C open Model 2234 Apparatus Scale L 2778 Doc. Use corded shielded o-w ire cable (see note par.3.2). Use VTs ith shield, connected earth (see standard par.3. No