ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 443 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
5.2.: 1. N. C ris tic 121/P Auxiliary voltage (galvanically separated) 24V ±20% Maximum ripple 5% Inrush current 24V ~10A for ms Rated power 24V ~2W 1 iro ris tic s Operating temperature Storage temperature Relative humidity Degree protection (with PR121/P installed the circuit-breaker) 12. 12..1 Calculating the RMS All the protection functions their respective processing the basis the real rms value the currents (the protection disabled for current values greater than 8In [where I4>0,8In], greater than 6In [where 0. 12.2. This function can activated through PR010/T test unit. 98% with condensation IP 30 Model L2234 Apparatus Scale L 2778 Doc.. This function can accessed through PR10/T test unit only via test bus and through HMI030 via local bus.7..e.2. For the fixed-time protections with adjustable delay, the relationship adopted follows: k. The PR121/P unit allows the neutral pole's current signal beprocessed using different relationships with the value the phases. 12. protection against overload with inverse time "L"; 2. □ atchdog for proper opening solenoid connection (TC)..2. Ifthe sensors are disconnected there Rating Plug error, when activated, opening command is issued due the being activated.5xIn current the Ne, the protection considered being set 100%. For the inverse-time protections, the relationship between trip time and overcurrent given the formula: /I2.4 unication bus Local bus rear connector; RS485 physical interface, Modbus protocol. □ atchdog for proper current sensor connection (CS). These functions are follows: □ Rating PLUG validity. □ atchdog for protection against Trip.. 12. -25°C . protectionagainst instantaneous short-circuit high currents "Iinst".2 easuring Function A current measuring function (ammeter) available all versions the PR121/P unit.8In] and greater than 4In [where I4<0,5In].3 atchdog The PR121/P unit provides some watchdog functions guarantee the proper management relay malfunctions. protectionagainst earth fault with adjustable delay "G"; 5.: Beyond 15. The characteristics the power pack are given the table below. The unit also has "backup protection" function. Test bus front test connector. 32/158 . the circuit-breaker does not open immediately the first time the Trip Coil hit (partial failure), TRIP commands are sent repeatedly until the circuit-breaker opens.1.n°. If the waveform has deformation beyond the declared limit (6.1.B. Any anomalies are indicated the LED coming on, explained par.3@2In), the tolerance for the calculation the true rms value will increase. With auxiliary voltage, the protection records historical the maximum current read. 12. protection against short-circuit with adjustable delay "S"; 3.2. +70°C -40°C . +90°C 0% . protectionagainst instantaneous short-circuit "I"; 4. 12.5In< I4<0.5. A timing indication ("alarm" LED) provided the front the unit, which enabled during alarm for each protection; disabled when the alarm condition ceases when the protection has been tripped. Any anomalies are indicated the LED coming on, explained par.5.. 2 Page No.7.The presence the auxiliary power supply enables the relay unit used even with the circuit-breaker open.5 Protection functions The PR121/P unit provides independent protection functions, i