ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 443 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
Test bus front test connector. The characteristics the power pack are given the table below. Any anomalies are indicated the LED coming on, explained par. This function can activated through PR010/T test unit. 12. 12.8In] and greater than 4In [where I4<0,5In]. protection against short-circuit with adjustable delay "S"; 3.e. +90°C 0% . For the inverse-time protections, the relationship between trip time and overcurrent given the formula: /I2.2.2 easuring Function A current measuring function (ammeter) available all versions the PR121/P unit. Any anomalies are indicated the LED coming on, explained par.: 1.2.. 32/158 .2.5. □ atchdog for proper current sensor connection (CS). 12. If the waveform has deformation beyond the declared limit (6. C ris tic 121/P Auxiliary voltage (galvanically separated) 24V ±20% Maximum ripple 5% Inrush current 24V ~10A for ms Rated power 24V ~2W 1 iro ris tic s Operating temperature Storage temperature Relative humidity Degree protection (with PR121/P installed the circuit-breaker) 12. □ atchdog for proper opening solenoid connection (TC).The presence the auxiliary power supply enables the relay unit used even with the circuit-breaker open. N.3 atchdog The PR121/P unit provides some watchdog functions guarantee the proper management relay malfunctions.1.4 unication bus Local bus rear connector; RS485 physical interface, Modbus protocol. 12. protection against overload with inverse time "L"; 2. +70°C -40°C .: Beyond 15.1 Calculating the RMS All the protection functions their respective processing the basis the real rms value the currents (the protection disabled for current values greater than 8In [where I4>0,8In], greater than 6In [where 0.3@2In), the tolerance for the calculation the true rms value will increase.7. These functions are follows: □ Rating PLUG validity. This function can accessed through PR10/T test unit only via test bus and through HMI030 via local bus.. 12.5 Protection functions The PR121/P unit provides independent protection functions, i.7.5. the circuit-breaker does not open immediately the first time the Trip Coil hit (partial failure), TRIP commands are sent repeatedly until the circuit-breaker opens..2.n°. The unit also has "backup protection" function.5xIn current the Ne, the protection considered being set 100%...1.2. With auxiliary voltage, the protection records historical the maximum current read. The PR121/P unit allows the neutral pole's current signal beprocessed using different relationships with the value the phases. Ifthe sensors are disconnected there Rating Plug error, when activated, opening command is issued due the being activated. 12. protectionagainst instantaneous short-circuit high currents "Iinst". protectionagainst instantaneous short-circuit "I"; 4.5. A timing indication ("alarm" LED) provided the front the unit, which enabled during alarm for each protection; disabled when the alarm condition ceases when the protection has been tripped.5In< I4<0.B. -25°C .. 2 Page No. For the fixed-time protections with adjustable delay, the relationship adopted follows: k. □ atchdog for protection against Trip. 98% with condensation IP 30 Model L2234 Apparatus Scale L 2778 Doc. protectionagainst earth fault with adjustable delay "G"; 5