ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 443 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
2 Page No.2.n°. protectionagainst earth fault with adjustable delay "G"; 5. protectionagainst instantaneous short-circuit "I"; 4..8In] and greater than 4In [where I4<0,5In]. 12. 12. protection against overload with inverse time "L"; 2.1.2. 12. N. Ifthe sensors are disconnected there Rating Plug error, when activated, opening command is issued due the being activated.5 Protection functions The PR121/P unit provides independent protection functions, i. The unit also has "backup protection" function. C ris tic 121/P Auxiliary voltage (galvanically separated) 24V ±20% Maximum ripple 5% Inrush current 24V ~10A for ms Rated power 24V ~2W 1 iro ris tic s Operating temperature Storage temperature Relative humidity Degree protection (with PR121/P installed the circuit-breaker) 12. A timing indication ("alarm" LED) provided the front the unit, which enabled during alarm for each protection; disabled when the alarm condition ceases when the protection has been tripped.1. Any anomalies are indicated the LED coming on, explained par.: Beyond 15. If the waveform has deformation beyond the declared limit (6. protection against short-circuit with adjustable delay "S"; 3. □ atchdog for proper current sensor connection (CS).3@2In), the tolerance for the calculation the true rms value will increase. 12. 98% with condensation IP 30 Model L2234 Apparatus Scale L 2778 Doc.: 1.The presence the auxiliary power supply enables the relay unit used even with the circuit-breaker open.5In< I4<0.5xIn current the Ne, the protection considered being set 100%.7. The PR121/P unit allows the neutral pole's current signal beprocessed using different relationships with the value the phases.5. 32/158 .4 unication bus Local bus rear connector; RS485 physical interface, Modbus protocol. 12. With auxiliary voltage, the protection records historical the maximum current read.5. These functions are follows: □ Rating PLUG validity. Test bus front test connector. -25°C . For the fixed-time protections with adjustable delay, the relationship adopted follows: k.2. This function can accessed through PR10/T test unit only via test bus and through HMI030 via local bus. +70°C -40°C ..e.5. The characteristics the power pack are given the table below..2. Any anomalies are indicated the LED coming on, explained par..B. 12..2. the circuit-breaker does not open immediately the first time the Trip Coil hit (partial failure), TRIP commands are sent repeatedly until the circuit-breaker opens. protectionagainst instantaneous short-circuit high currents "Iinst".. □ atchdog for proper opening solenoid connection (TC).2 easuring Function A current measuring function (ammeter) available all versions the PR121/P unit. □ atchdog for protection against Trip.3 atchdog The PR121/P unit provides some watchdog functions guarantee the proper management relay malfunctions. For the inverse-time protections, the relationship between trip time and overcurrent given the formula: /I2.7.1 Calculating the RMS All the protection functions their respective processing the basis the real rms value the currents (the protection disabled for current values greater than 8In [where I4>0,8In], greater than 6In [where 0. This function can activated through PR010/T test unit. +90°C 0%