ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 418 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
C aution - Use dry, dust-free room free aggressive chemical agents storage room - Position the circuit-breaker and any fixed part horizontal surface, not direct contact with the floor, but suitable support surface (Fig. 7/158 . the circuit-breaker has remain the warehouse even for short time before being put into service, after checking receipt, must be put back its container and covered with waterproof sheet. Checking receipt Examine the state the material received and its consistency with the content the order. 5) - The maximum number stackable circuit-breakers indicated figure 6 - Keep the circuit-breaker the open position and with the closing springs unloaded avoid unnecessary stresses and the risk accidents to the personnel. Storage, lifting and weights The circuit-breaker, protected external wooden crate, fixed means screws the transport pallet the bottom the packing case.1.5 Fixed part construction characteristics 1 Steel sheet supporting structure 2 Earthing contacts (a: for all versions; for E4, E6) 3 Safety shutters (IP20 degree protection) 4 Insulating terminal support base 5 Terminals 6 ontacts for signalling connected/test isolated/disconnected (on request) 7 Sliding contacts 8 Padlock for safety shutters (on request)) 9 Anti-racking-in lock for circuit-breakers of different size 10 Fixing holes (qty for E1, E2, E3, for E4, E6) Fig. Should any damage errors found unpacking, which must carried out carefully, make the relative notification within and not over days from the receipt the material. 3. The notification must indicate the number the shipping note. Model 2234 Apparatus Scale L 2778 Doc-No' 1SDH000460R0002 Page No. 4 2