ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 219 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
Remove the PR123/DC unit from the circuit-breaker 9.2 Uninstalling To complete the procedure for uninstalling PR123/DC unit, follow the steps below: 1.13. With the circuit-breaker open and/or isolated power the unit from the PR030/B 2. Select "Unit installation" 7. Input the password 8. Select "Uninstall" and press "ENTER" 7. type circuit-breaker, Rating Plug size. To enter new password, select the "New Password" item the "Settings/System" menu.3. the password correct, you from the "READ" state to the "EDIT" state.6. 13.. Select "Circuit-breaker" 4.3. Check for the absence configuration errors.3.5 Password management Specify password? [0***] To enter "EDIT" mode necessary enter four-figure numerical password. After entering the fourth figure, check the password you have entered. Select the value the first figure between '0' and '9' means the and keys and press confirm the figure and then move enter the next one. The data question are then transmitted the new PR123/DC unit installed on the same circuit-breaker. Enter the unit's "Settings" menu 5.6. Select "Circuit-breaker" 6. Model 7 A pparatus Emax DC S cale D oc-N 1SDH000635R0002 Page No. 13. By setting the value the password [0000] (on the "Unit configuration" menu) the password prom disabled. The values attributable the password from 0000 9999. Power the relay from any other source 11. When the red led flashes and off and the message Installation (installation error) displayed, remove the PR030/B 10. Remove the PR030/B 8. It not strictly necessary complete the uninstalling procedure, but this enables the parameters relating the circuit-breaker, such contact wear and others, saved, otherwise these data would lost. 13.. Power the unit ONLY from the PR030/B 3.4).g. Select "Install" and press "ENTER" 9. 61/108 .3.4 Initial settings If the PR123/DC supplied ready installed the circuit-breaker, ABB SACE set all the variables referring the circuit-breaker or the specific application correctly (e. When the PR120/V module installed, user must properly set the rated voltage.3. Select "Unit installation" 5. Enter the unit's "Settings" menu 3. With the circuit-breaker open and preferably isolated, install the protection unit the circuit-breaker 2. The remove the connector, proceed indicated the figure alongside.4. Vice versa, the PR123/DC supplied separately, will the user set all the necessary parameters correctly. there are other errors, the display will show the message Configuration (configuration error) accompanied the yellow LED coming permanently (warning) 4. Disabling the Password.4. 13.6 Replacing electronic release 13.). 13.4. For the default password see par. If the password wrong, the message Wrong password appears and remains until the ESC key pressed (or until interval seconds has elapsed). therefore always possible to switch from "READ" "EDIT". Input the password 6. Apart from this, absolutely indispensable for the user modify the password and carefully define each modifiable parameter, before putting the PR123/DC into service. It also possible interrupt the password entry procedure pressing the ESC key. Note that ABB SACE defines each possible setting according the content the paragraph the default parameters (see par.1 Installation To complete the procedure for installing PR123/DC unit, follow the steps below: 1