ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 218 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
1 Connections A For the connections provided the user, recommended that you comply strictly with the recommendations contained in this document.This will enable satisfy all the international reference standards and guarantee perfect operation of the relay even under severe environmental and electromagnetic conditions.3 utting into service 13. Check the open closed state the circuit-breaker the same "PR123/DC Test" screen, checking that the closed and de-energized. 60/1 08 . T 1/6 CB statu s A Test Trip (disabled) CB open Model 3447 pparatus cale Doc. Pay particular attention the types cable, the connections earth and the recommended maximum distances.3 Test Before putting into service, test can conducted means the specific "Auto test" function which can activated the PR123/DC.7 Trip curves for function RP 103 102 10 10-' -0. Then test can conducted the whole chain, again using the specific function (Trip test).[s] 104 13. disconnected messages must appear; they do, do not close the circuit-breaker immediately and make the correct connections.4 -0.3 -0. 13. 13.3.2.2 " 1 i i i i i ' 1 1 * - 5- -0.3. positive result shown the display. No.10.2 connection test If the PR123/DC was installed the user, important, before closing the CB, check the last line the display when the relay turned for the first time via PR030/B battery unit. 1SDH000635R0002 Page No.1 0 x Pn 13.3. positive result shown the circuit-breaker opening.To run Trip Test, press the Test” button and the Enter” button simultaneously