ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 218 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
2 " 1 i i i i i ' 1 1 * - 5- -0.3 utting into service 13. disconnected messages must appear; they do, do not close the circuit-breaker immediately and make the correct connections. No.1 Connections A For the connections provided the user, recommended that you comply strictly with the recommendations contained in this document. Check the open closed state the circuit-breaker the same "PR123/DC Test" screen, checking that the closed and de-energized. 60/1 08 .2 connection test If the PR123/DC was installed the user, important, before closing the CB, check the last line the display when the relay turned for the first time via PR030/B battery unit.To run Trip Test, press the Test” button and the Enter” button simultaneously. positive result shown the circuit-breaker opening. 1SDH000635R0002 Page No.10.3 -0. Then test can conducted the whole chain, again using the specific function (Trip test). positive result shown the display. 13.3.[s] 104 13.2. T 1/6 CB statu s A Test Trip (disabled) CB open Model 3447 pparatus cale Doc.This will enable satisfy all the international reference standards and guarantee perfect operation of the relay even under severe environmental and electromagnetic conditions.3.1 0 x Pn 13. Pay particular attention the types cable, the connections earth and the recommended maximum distances.3 Test Before putting into service, test can conducted means the specific "Auto test" function which can activated the PR123/DC.3.4 -0.7 Trip curves for function RP 103 102 10 10-' -0. 13