ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 63 z 79







Poznámky redaktora
Press Yes the question “Are you sure?” 4. 5. Enter the menu Service settings using following path: Menu SETTINGS Service Settings New PCB and press Select 3. Set the parameter Ratio Ir. (table 2) 6. For set-up Torque Control during start and stop see separate manual sheet update manual. 11. (table 1or 2) 7. Set the parameters SOP1 SOP4. After pressing Next when the parameter PST(B) set, the programming complete. the board changed, a programming this must done before the softstarter can taken operation.Configuration the LVboard If only the board changed, the softstarter ready start. Press Store save the value and press Next continue. (table 1or 2) 8. (table 1or 2) 10. 2. Set the parameter ByPass AC3. 1. Set the required display language. If wrong language was selected press Back for previous level. Set the parameter PST(B). (table 2) 9. Before taking the softstarter operation, don’t forget set the rated motor current and activate the required protections, warnings, input outputs etc. Follow the step step instruction below this set-up. These commands are valid for the whole set-up. 12. Every softstarter size has its own parameter values for the board according table that must used. Switch the power supply (terminal 1and 2). Set the parameter Int ByPass. -