ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 56 z 79







Poznámky redaktora
• Function test the keypad and display. • Programming. Delivery • Each completed and tested softstarter delivered with installation maintenance manual. The number combination the stamp stands for ”year” and ’’calendar week” production and testing.Check that the circuit board and fan voltages correspond with the manufacturing specification and the rated marking plate. • Function test start ramp and stop ramp. Tripping current mA. • Voltage test control circuit, 1,0 during 1s. Also check that indication correct the unit. Between connection block 1,2,12,13,14,15,16,17,18,19,20 and earth. Do not apply test voltage before the test object connected. Test between the phases: 1,4 during 1s. Test between the phase and earth: 2,7 during 1s. • Test stamp green area label right hand side the softstarter. • Test by-pass function, and that indication the unit correct. The test voltage may not connected until the test object connected. • Visual check the completed product. J I M IP ABB Automation Technology AB, CEWE Control S-721 Vasteras, SWEDEN Telephone +46 00 TELEFAX +46 01 -. • Voltage test main circuit: Tripping current mA