ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 56 z 79







Poznámky redaktora
Also check that indication correct the unit. The number combination the stamp stands for ”year” and ’’calendar week” production and testing. • Voltage test main circuit: Tripping current mA. Delivery • Each completed and tested softstarter delivered with installation maintenance manual. Between connection block 1,2,12,13,14,15,16,17,18,19,20 and earth. • Voltage test control circuit, 1,0 during 1s. • Programming. J I M IP ABB Automation Technology AB, CEWE Control S-721 Vasteras, SWEDEN Telephone +46 00 TELEFAX +46 01 -. Test between the phase and earth: 2,7 during 1s. Tripping current mA. • Test by-pass function, and that indication the unit correct. The test voltage may not connected until the test object connected. • Visual check the completed product. • Function test the keypad and display.Check that the circuit board and fan voltages correspond with the manufacturing specification and the rated marking plate. Do not apply test voltage before the test object connected. Test between the phases: 1,4 during 1s. • Function test start ramp and stop ramp. • Test stamp green area label right hand side the softstarter