ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 56 z 79







Poznámky redaktora
• Programming.Check that the circuit board and fan voltages correspond with the manufacturing specification and the rated marking plate. • Voltage test control circuit, 1,0 during 1s. Do not apply test voltage before the test object connected. Delivery • Each completed and tested softstarter delivered with installation maintenance manual. • Function test start ramp and stop ramp. J I M IP ABB Automation Technology AB, CEWE Control S-721 Vasteras, SWEDEN Telephone +46 00 TELEFAX +46 01 -. Between connection block 1,2,12,13,14,15,16,17,18,19,20 and earth. Test between the phase and earth: 2,7 during 1s. • Function test the keypad and display. • Visual check the completed product. Also check that indication correct the unit. • Test stamp green area label right hand side the softstarter. • Test by-pass function, and that indication the unit correct. • Voltage test main circuit: Tripping current mA. Tripping current mA. The test voltage may not connected until the test object connected. The number combination the stamp stands for ”year” and ’’calendar week” production and testing. Test between the phases: 1,4 during 1s