ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 56 z 79







Poznámky redaktora
Between connection block 1,2,12,13,14,15,16,17,18,19,20 and earth. J I M IP ABB Automation Technology AB, CEWE Control S-721 Vasteras, SWEDEN Telephone +46 00 TELEFAX +46 01 -. • Voltage test main circuit: Tripping current mA. • Programming. • Test by-pass function, and that indication the unit correct. Test between the phases: 1,4 during 1s. • Function test start ramp and stop ramp.Check that the circuit board and fan voltages correspond with the manufacturing specification and the rated marking plate. Do not apply test voltage before the test object connected. Test between the phase and earth: 2,7 during 1s. • Voltage test control circuit, 1,0 during 1s. • Test stamp green area label right hand side the softstarter. Also check that indication correct the unit. • Visual check the completed product. • Function test the keypad and display. Delivery • Each completed and tested softstarter delivered with installation maintenance manual. Tripping current mA. The number combination the stamp stands for ”year” and ’’calendar week” production and testing. The test voltage may not connected until the test object connected