• Programming.Check that the circuit board and fan voltages correspond with the manufacturing
specification and the rated marking plate.
• Visual check the completed product.
Test between the phase and earth: 2,7 during 1s.
• Function test start ramp and stop ramp.
Test between the phases: 1,4 during 1s.
J I
M IP
ABB Automation Technology AB, CEWE Control
S-721 Vasteras, SWEDEN
Telephone +46 00
TELEFAX +46 01
-.
The test voltage may not connected until the test object connected. Also check that indication correct the
unit. The number
combination the stamp stands for ”year” and ’’calendar week” production and
testing.
• Voltage test main circuit:
Tripping current mA.
• Voltage test control circuit, 1,0 during 1s.
Delivery
• Each completed and tested softstarter delivered with installation maintenance manual.
• Test by-pass function, and that indication the unit correct.
Between connection block 1,2,12,13,14,15,16,17,18,19,20 and earth.
Do not apply test voltage before the test object connected.
Tripping current mA.
• Test stamp green area label right hand side the softstarter.
• Function test the keypad and display