ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 56 z 79







Poznámky redaktora
Tripping current mA. J I M IP ABB Automation Technology AB, CEWE Control S-721 Vasteras, SWEDEN Telephone +46 00 TELEFAX +46 01 -. Do not apply test voltage before the test object connected. • Programming. • Visual check the completed product.Check that the circuit board and fan voltages correspond with the manufacturing specification and the rated marking plate. The number combination the stamp stands for ”year” and ’’calendar week” production and testing. Also check that indication correct the unit. Between connection block 1,2,12,13,14,15,16,17,18,19,20 and earth. Test between the phases: 1,4 during 1s. • Test by-pass function, and that indication the unit correct. • Function test the keypad and display. Delivery • Each completed and tested softstarter delivered with installation maintenance manual. Test between the phase and earth: 2,7 during 1s. • Function test start ramp and stop ramp. • Test stamp green area label right hand side the softstarter. • Voltage test main circuit: Tripping current mA. The test voltage may not connected until the test object connected. • Voltage test control circuit, 1,0 during 1s