ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 56 z 79







Poznámky redaktora
• Programming.Check that the circuit board and fan voltages correspond with the manufacturing specification and the rated marking plate. • Test by-pass function, and that indication the unit correct. Between connection block 1,2,12,13,14,15,16,17,18,19,20 and earth. The test voltage may not connected until the test object connected. Test between the phase and earth: 2,7 during 1s. J I M IP ABB Automation Technology AB, CEWE Control S-721 Vasteras, SWEDEN Telephone +46 00 TELEFAX +46 01 -. • Test stamp green area label right hand side the softstarter. • Function test the keypad and display. • Voltage test main circuit: Tripping current mA. Test between the phases: 1,4 during 1s. Tripping current mA. Delivery • Each completed and tested softstarter delivered with installation maintenance manual. Do not apply test voltage before the test object connected. • Function test start ramp and stop ramp. The number combination the stamp stands for ”year” and ’’calendar week” production and testing. • Visual check the completed product. Also check that indication correct the unit. • Voltage test control circuit, 1,0 during 1s