Poznámky redaktora
J I
M IP
ABB Automation Technology AB, CEWE Control
S-721 Vasteras, SWEDEN
Telephone +46 00
TELEFAX +46 01
-.
Delivery
• Each completed and tested softstarter delivered with installation maintenance manual.
Test between the phases: 1,4 during 1s.
• Programming.
• Function test start ramp and stop ramp.
Tripping current mA.
• Test by-pass function, and that indication the unit correct. Also check that indication correct the
unit. The number
combination the stamp stands for ”year” and ’’calendar week” production and
testing.
The test voltage may not connected until the test object connected.
• Visual check the completed product.
Test between the phase and earth: 2,7 during 1s.
• Function test the keypad and display.Check that the circuit board and fan voltages correspond with the manufacturing
specification and the rated marking plate.
Between connection block 1,2,12,13,14,15,16,17,18,19,20 and earth.
• Test stamp green area label right hand side the softstarter.
• Voltage test control circuit, 1,0 during 1s.
Do not apply test voltage before the test object connected.
• Voltage test main circuit:
Tripping current mA