Poznámky redaktora
• Function test the keypad and display.
• Programming.
Delivery
• Each completed and tested softstarter delivered with installation maintenance manual. The number
combination the stamp stands for ”year” and ’’calendar week” production and
testing.Check that the circuit board and fan voltages correspond with the manufacturing
specification and the rated marking plate.
• Function test start ramp and stop ramp.
Tripping current mA.
• Voltage test control circuit, 1,0 during 1s. Also check that indication correct the
unit.
Between connection block 1,2,12,13,14,15,16,17,18,19,20 and earth.
Do not apply test voltage before the test object connected.
Test between the phases: 1,4 during 1s.
Test between the phase and earth: 2,7 during 1s.
• Test stamp green area label right hand side the softstarter.
• Test by-pass function, and that indication the unit correct.
The test voltage may not connected until the test object connected.
• Visual check the completed product.
J I
M IP
ABB Automation Technology AB, CEWE Control
S-721 Vasteras, SWEDEN
Telephone +46 00
TELEFAX +46 01
-.
• Voltage test main circuit:
Tripping current mA