ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 53 z 79







Poznámky redaktora
Connect the megger the main terminals the softstarter 1L1 and 2T1 according figure Note the result. guide for good thyristor when the value above 1Mohm. Disconnect these six sets cables form the HV-board. are position, properly connected (they may slide off during handling the plastic top). Please also check that all other cables, for the temperature sensor, fans etc.Discharge the tools and yourselfby touching earth (ifyou are not earthed). Set the megger 500V. An analysis the test result from all three phases will show you have shorted , thyristor not.When ready you will have six different values. Mound the plastic top back position and finally, reconnect all control cables and the main cables. Note the result Repeat the tests the two remaining phases between Figure B 3L2 4T2 and 5L3 6T3. When identified shorted has replaced with new one. There are different instructions depending both type and size of softstarters. Mark the cables from the thyristors with L1, and L3. Look for values, which are not line with the majority the thyristors, 2T1 showing lower value. Figure A 2T1 Change the connection according figure and repeat the measurement. Then you are Ready for start!! -. If you need change thyristor thyristor block, please look the separate instructions for changing thyristors. When ready, please make sure that you reconnected the gate cables the same position before