ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 53 z 79







Poznámky redaktora
Mound the plastic top back position and finally, reconnect all control cables and the main cables. Look for values, which are not line with the majority the thyristors, 2T1 showing lower value. Set the megger 500V. When ready, please make sure that you reconnected the gate cables the same position before. guide for good thyristor when the value above 1Mohm. Please also check that all other cables, for the temperature sensor, fans etc. Then you are Ready for start!! -. Disconnect these six sets cables form the HV-board. There are different instructions depending both type and size of softstarters. When identified shorted has replaced with new one. Mark the cables from the thyristors with L1, and L3. are position, properly connected (they may slide off during handling the plastic top). Note the result Repeat the tests the two remaining phases between Figure B 3L2 4T2 and 5L3 6T3. Connect the megger the main terminals the softstarter 1L1 and 2T1 according figure Note the result. If you need change thyristor thyristor block, please look the separate instructions for changing thyristors. Figure A 2T1 Change the connection according figure and repeat the measurement.Discharge the tools and yourselfby touching earth (ifyou are not earthed). An analysis the test result from all three phases will show you have shorted , thyristor not.When ready you will have six different values