Poznámky redaktora
..6 Signaling LEDs
ATS010 state
PO green hen pow supply present
ABB SACE SACE ATS010 RH0202002 L2467 /48
.
1
T4
LOAD off
Exam ple tim diagram strategy operation, long delay
Note: Strategy only possible open the emergency line powered., the gen set takes long tim start up).Strategy delay set too long com pared the other delays, once the gen
set started and the delay has elapsed, the 010 till aits the net anomaly
detection delay, T1, elapse before opening irc breaker -N.
Therefore, the delay between pow loss and the opening longer
than (e.
V-N ok
CB-N on
T1
GE Start
T2 T3
V-E ok
CB-E on
t .g.. only the tim e
delay between pow loss and the opening the B-N .
KEY
Ind icatio the signals the diagrams:
V ok: norm line voltage present and ith set lim its
(1 ok, ko)
C on: norm line breaker closed closed, open)
G start: gen set started start, stop)
V-E ok: emergency line voltage present and ith set lim its
(1 ok, ko)
C B-E on: emergency line breaker closed closed, open)
L off: ity tiv s
disconnected, loads connected)