ABB Jednotka řízení záskoku Návod k instalaci a provozu (4)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 108 z 185

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
3). A the end fthis sequence, only the Power LED (green) remains on. The two breaker LEDS remain off.5). □ Pow the ATS010. With selector this position, the unit will keep the circuit breakers open during set-up. I not, see Trouble-shooting guide (5.2. □ axim and inim voltage □ Tim delays N lly these settings can ifie after the has been set up. Set-up F llo this procedure lets set the and, the same tim check that in sta lla tion has been carried out correctly. □ itia set-up ith ATS010 not pow ered and ith irc breakers the open position. 5. A fte each step, check that the expected result achieved. □ circu breakers that can ith draw removed: itch pow supply to the otor operators con trol coils, place circu breakers the w ith sitio and then return them the connected position.perating voltage Single-phase: select value voltage between phase and neutral Three-phase: select value phase neutral voltage □ itching strategy ■ otor operators con trol coils) are pow ered directly fro the norm and gen set lines, select strategy only. A trim side panel (see 3. I alarm device present, stopsfunctioning. How ever, it is not advisable start operations ith the positions the regulations. ABB SACE SACE ATS010 RH0202002 L2467. All LEDs thefront panelflash briefly and then sequence.3. I fnormal line voltage ispresent without anomalies, the green LEDS L1, L2, R,S,T are (in single-phase operating mode only green LED L1 on). OFF. Warning: the alarm signal contact closed! □ Set the selector norm-emer