Poznámky redaktora
Set-up
F llo this procedure lets set the and, the same tim check that
in sta lla tion has been carried out correctly.
A trim side panel (see 3.
ABB SACE SACE ATS010 RH0202002 L2467.
□ itia set-up ith ATS010 not pow ered and ith irc breakers the
open position. How ever, it
is not advisable start operations ith the positions the regulations.
5.
A fte each step, check that the expected result achieved.3.
□ Pow the ATS010.
I not, see Trouble-shooting guide (5.
Warning: the alarm signal contact closed!
□ Set the selector norm-emer.5).3).
A the end fthis sequence, only the Power LED (green) remains on.
□ axim and inim voltage
□ Tim delays
N lly these settings can ifie after the has been set up.2.perating voltage
Single-phase: select value voltage between phase and neutral
Three-phase: select value phase neutral voltage
□ itching strategy
■ otor operators con trol coils) are pow ered directly fro the
norm and gen set lines, select strategy only. OFF.
With selector this position, the unit will keep the circuit breakers
open during set-up.
I alarm device present, stopsfunctioning.
I fnormal line voltage ispresent without anomalies, the green LEDS L1,
L2, R,S,T are (in single-phase operating mode only green LED
L1 on).
The two breaker LEDS remain off.
All LEDs thefront panelflash briefly and then sequence.
□ circu breakers that can ith draw removed: itch pow supply
to the otor operators con trol coils, place circu breakers the
w ith sitio and then return them the connected position