Poznámky redaktora
A trim side panel (see 3.
The two breaker LEDS remain off.
With selector this position, the unit will keep the circuit breakers
open during set-up.perating voltage
Single-phase: select value voltage between phase and neutral
Three-phase: select value phase neutral voltage
□ itching strategy
■ otor operators con trol coils) are pow ered directly fro the
norm and gen set lines, select strategy only.
5. How ever, it
is not advisable start operations ith the positions the regulations.3.
Warning: the alarm signal contact closed!
□ Set the selector norm-emer.
A the end fthis sequence, only the Power LED (green) remains on.5). Set-up
F llo this procedure lets set the and, the same tim check that
in sta lla tion has been carried out correctly.
A fte each step, check that the expected result achieved.
□ itia set-up ith ATS010 not pow ered and ith irc breakers the
open position.
□ Pow the ATS010.
All LEDs thefront panelflash briefly and then sequence.
I alarm device present, stopsfunctioning. OFF.
□ circu breakers that can ith draw removed: itch pow supply
to the otor operators con trol coils, place circu breakers the
w ith sitio and then return them the connected position.
I fnormal line voltage ispresent without anomalies, the green LEDS L1,
L2, R,S,T are (in single-phase operating mode only green LED
L1 on).
ABB SACE SACE ATS010 RH0202002 L2467.
I not, see Trouble-shooting guide (5.3).
□ axim and inim voltage
□ Tim delays
N lly these settings can ifie after the has been set up.2