ABB Jednotka řízení záskoku Návod k instalaci a provozu (4)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 100 z 185

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
alarm, icroprocessor failure, pow outage, .5. the contact open, means the gic has been disabled r some reason (e.4 Alarm signaling A contact signals the presence irc breaker alarm gen set alarm an alarm the ATS itself.g.3. Loads are reconnected urin reverse itching back norm line operation hen the line irc breaker closes. 3. ABB SACE SACE ATS010 RH0202002 L2467.5.2 Gen set start/stop A changeover contact commands the gen set start and shut down. This contact operates ith trin sic safety and norm ally kept open during norm device operation.5.5 Logic state This contact closed and kept closed, ith trinsic safety, hen autom atic transfer sw itch gic active. 3.5. 3.3 Low priority load Connection/Disconnection A changeover contact makes possible disconnect rio rity loads hen the norm line irc breaker opens. hen the contact closed, there is either alarm present xiliary supply