TOPJOB® S Rail-Mount Terminal Block Systems

| Kategorie: Katalog  | Tento dokument chci!

Vydal: WAGO Elektro spol. s r.o. Autor: WAGO

Strana 100 z 268

Jak získat tento dokument?






Poznámky redaktora
• Combines high functionality with compact design (99. TOPJOB® S Current Transformer Terminal Blocks, 2007-8821 (Orange Disconnect Link) . Advantages: • Top-of-unit circuit jumper slot for shorting path activa- tion • Disconnect link provides intuitive and easy operation, as well exact switching status indication. Using locking covers profiles for adjacent terminal blocks allows disconnect links operated simultane- ously. First, the current transformer shorted via disconnect link and circuit jumper (insert jumper, move disconnect link from operating position shorting position II, activate shorting path). • Touch-proof test sockets for test plugs on transformer and meter side.com Rail-Mount Terminal Blocks, TOPJOB® S Rail-Mount Terminal Blocks, TOPJOB® S WAGO’s TOPJOB® Current Transformer (Disconnect/ Test) Terminal Block (2007-8821) designed for current transformer circuits. • With terminal block width mm, the maximum cross-section for solid and fine-stranded conductors is mm² AWG) and mm² (10 AWG) for ferruled conductors.6 mm long and wide). Insert insulated, touch-proof circuit jumpers into jumper slot. • Compatible with through and ground conductor terminal blocks having the same profile.wago.98 Jumper slot Conductor entry Test socket Test socket Circuit jumper Meter side Transformer side Disconnect link in operating position I Jumper slot Conductor entry Jumper slot Conductor entry Test socket Test socket Circuit jumper Meter side Transformer side Disconnect link in measuring position III (test current measurement) Jumper slot Conductor entry Jumper slot Conductor entry Test socket Test socket Circuit jumper Meter side Transformer side Disconnect link in shorting position II Jumper slot Conductor entry www. • All 2007 Series terminal blocks are rated A/500 V (IEC) and 300 (UL). Preparing shorting path for the current transformer circuits. Connecting measurement device via test socket the meter side can only performed once circuit disconnection complete (disconnect link in measuring position III)