Technical Section WAGO

| Kategorie: Leták / Datasheet Firemní tiskovina  | Tento dokument chci!

Vydal: WAGO Elektro spol. s r.o.

Strana 8 z 44

Jak získat tento dokument?






Poznámky redaktora
com b) b) a) a) It Length test conductor between point and b): 100 mm Length test conductor between point and b): 100 mm Fixing point Fixing point 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 -1500 -1400 -1300 -1200 -1100 -1000 -900 -800 -700 -600 -500 -400 -300 -200 -100 0 100 200 Status: Stop Cause: Number shocks ready! Date: 2004-05-03 Control: active Time: 08:53:16 Total number shocks: 4 Modulation: 100 % Warning limits: inactive Top acceleration: 1017.37 m/s² Turn-off limits: inactive Speed: 3.78 m/s Time-Dependent Course the Shock 100 ms Negative Direction a m/s² t in ms 0.wago.80 m/s2 Speed: 3. Example: Shock requirement per IEC/EN 60068-2-27 (half-sine shock) 100g acceleration, duration Shock direction: axes shocks each positive and negative direction) • Shock Test per IEC/EN 60068-2-27; IEC/EN 61373 (Railway Applications) .7 www.445 Upper warning limits Set acceleration curve Lower warning limits Actual acceleration curve Upper turn-off limits Measured acceleration curve Lower turn-off limits 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 -200 -100 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 Upper warning limits Set acceleration curve Lower warning limits Actual acceleration curve Upper turn-off limits Measured acceleration curve Lower turn-off limits t in ms 0.77 m/s Warning limits: WAGO Rail-Mount Terminal Block Systems Technical Information The shock test similar the vibration test except that, instead continuous vibrations, single shocks are applied the specimen.445 Time-Dependent Course the Shock 100 ms Positive Direction a m/s² Date: Number shocks ready! Cause: Stop Status: 2004-03-05 Control: active Time: Modulation: 100 % Turn-off limits: 08:52:00 inactive inactive Total number shocks: 4 Top acceleration: 1008. Like the vibration tests, shock tests are primarily used test the voltage drop variation contact breaks, etc. Tests for special requirements often call for much higher values. Shock tests are usually performed with acceleration 20g, for example, over period ms