ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 165 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
However, the use ropes allowed. Model 3447 A pparatus Emax DC S cale D oc-N 1SDH000635R0002 Page No. the anti-racking-in lock has been supplied separately, proceed assemble follows: - the self-adhesive plate (4), find the assembly position the stop bolts relation the circuit-breaker which has housed the fixed part.2 Installation fixe circu it-b r Fix the circuit-breaker horizontal surface using the screws (M10 x 12 min. 8 4. 7 Table the circuit-breaker weights (Kg.3 sta lla tion fixe ith circu it-b r 4. Installation 4. - Anti-racking-in plate the moving part (5).) Selective circuit-breaker Fixed 3 poles version 4 poles Withdraws 3 poles ble version 4 poles E2 93 E3 104 125 E4 120 147 170 E6 140 165 210 250 4. 4. Make sure that the anti-racking-in lock corresponding the one installed the fixed part present the circuit-breaker (moving part). - Fix the screws with the washers (2) and the hexagonal stops (3). - Insert the hexagonal-head screws (1) the holes found the previous item shown the figure.3. this case, the lifting ropes must hooked shown the figures (the lifting plates are always supplied with the circuit-breaker). 7/108 .). Where this is not possible, install inside switchboard with suitable degree of protection.1 Preparation the fixed part Assembly the anti-racking-in lock Before installing the fixed part, necessary check the presence the anti-racking-in lock for circuit-breakers with different electrical characteristics from those the fixed part. For the preparation the installation room, please refer the "Overall dimensions" paragraph, which gives information the following points: - minimum installation volumes the circuit-breakers and derived versions - distances respected for circuit-breakers compartments - overall dimensions the circuit-breakers - fixing drillings - compartment door drillings. Fig. Fig.1 sta lla tion room Install the circuit-breaker dry, dust-free, non-corrosive room, and in such way that not subject shocks vibrations. The installation, commissioning and any ordinary and extraordinary maintenance have done skilled personnel, with detailed knowledge the apparatus.With regard lifting, follow the instructions: the circuit-breakers must placed sturdy supporting surface and lifted, preferably, means of special fork-lift truck