ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 164 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
1. The notification must indicate the number the shipping note. the circuit-breaker has remain the warehouse even for short time before being put into service, after checking receipt, must be put back its container and covered with waterproof sheet. 3. Should any damage errors found unpacking, which must carried out carefully, make the relative notification within and not over days from the receipt the material. 6/108 . a) - The maximum number stackable circuit-breakers indicated figure 6 - Keep the circuit-breaker the open position and with the closing springs unloaded avoid unnecessary stresses and the risk accidents to the personnel. Checking receipt Examine the state the material received and its consistency with the content the order. 4 2. / \ ---------- ---------------- » Model y A pparatus Emax DC S cale D oc-N 1SDH000635R0002 Page No. Caution - Use dry, dust-free room free aggressive chemical agents storage room - Position the circuit-breaker and any fixed part horizontal surface, not direct contact with the floor, but suitable support surface (Fig.a Fixed part stru ctio cte ristics 1 teel sheet ortin structure 2 Earthing contacts (a: for all versions; for E4, E6) 3 afety shutte (IP20 ree protection) 4 Insulating term inal base a Term inals 6 llin /te t isolated/disconnected (on request) y liding contacts 8 dlock safety shutters (on request)) 9 ti-rackin g-in circuit-breakers of different size 10 Fixing holes (qty E2, E3, E4, E6) Fig. Storage, lifting and weights The circuit-breaker, protected external wooden crate, fixed means screws the transport pallet the bottom the packing case