ZEZ Silko (datasheety mix)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ZEZ SILKO s.r.o. Autor: ZEZ SILKO Žamberk

Strana 88 z 177

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
3, SET-UP phase) Lagging Inductive kVAr Cos^ 180° kVAr Cos^ Leading/Capacitive -90° 90° Lagging Inductive kVAr Cos^ kVAr Cos^ Leading/Capacitive E xported er Im ported er . Must use switch automatic switch for supply the regulator L1 L2L3N S1 ®O0 S2 [] P1 P2 RELAY C1. The regulator supply (C-D terminals) must taken between two phases and the should located the third phase.cz For more information, the complete manual can downloaded from the web site ZEZ SILKO: Any manipulation use the equipment out the conditions specified the manufacturer may put risk the user safety.- TECHNICAL CHARACTERISTICS 3. See 4. Check phase connection and setup there exported energy and the indication not correct (see 4.S upply and measurem ent input term inals (C-D) upply cables size and protection Current easurem ent circuit Current easurement margin ccuracy measurements 480,400, 230 110 +15% -10% 45-65 (see label) Connect preferably phases L2-L3 Cross section 1,5mm2 0,5 Fuses type Current transform (CT) Place preferably phase Minimum cabling cross section 2,5mm2 0,1 (maximum overload +20%) Voltage and current :1%; cos9 digit 110V: (no load) VA(6 relays); 9,8 VA(12 relays) Power consum ptions 230V: (no load) VA(6 relays); 9,6 VA(12 relays) 400V: (no load) 7,5 VA(6 relays); 9,5 VA(12 relays) 480V: 7,8 (no load) 8,6 VA(6 relays); VA(12 relays) Display Output Relay Contacts Output Relay Cabling and Protection Alarm Output Relay Compliant the following Standards Safety Insulation Environm ent lim conditions Protection degree line digits 7segments icons Max. See paragraph Program setting. Max.2 Delay time setting for switching on/off operations steps setting Setting phase and polarity connection Cursor keys (when setting mode) Manual OFF (push during more than when RUN mode) Push both see the connected steps SETUP KEY: Push during more than enter SETUP mode Lagging current indication (Inductive load) Leading current indication (Capacitive load) © © (0 y This manual easy guide for the use and operation the Controller 6/P 12. 1. Display Standard mode: Displays cos^ C0S9 Indication setting C/K setting.IZIIEIZ SILKO POW FACTOR REGULATOR c lle PFR12 Controller PFR6/ PFR12 y The Controller PFR6/ PFR12 regulators measure cosp supply system and control the connection and disconnection capacitors obtain target programmed value. 250 VAC, AC1 Cabling cross section 1,5mm2 Protection means circuit breaker curve) fuse (gl type) Last relay autom atically set alarm output not use 61010, 61000-3-2, 61000-3-3, 50081-2, 50082­ 50082-2, 61000-4-2, 61000-4-4, 61000-4-8, 61000-4-5, 61000-4-11 Category III Class II, According 61010-1, Tem perature limits: -20°C +60°C; Relative Humidity 95% (without condensation).C6 The current transformer CT, must located that measures the whole load current plus the correction capacitors C7. See technical characteristics for cable sizes and required protections.zez-silko. www... Altitude: 2000m IP51 (panel mounted) IP30 (regulator box) According EN-60529 Four Quadrants Operation The Controller regulators operate quadrants (suitable for imported exported active power). case miss operation protection fault the equipment must disconnected from supply and remain out service ensuring against any accidental reconnection. Before any maintenance operation the equipment must disconnected from power supply. For exported power, negative symbol displayed the cos^ indication.C12 Solo puterm Control system 12 I FCP inim num ber operations) 2.- Regulator Connection A POW PPLY For proper operation it's necessary install current transformer, (normally A), which primary must sized according the maximum expected load current the installation