Meter test for through external power supply
Changing the meter for L1
Test-disconnect terminals
W Y
Pos.6 GN
(9) STB 21.6 SW
(11) STB 21.
2.
1 ZEW (nur 35) 9540000000
1 EWK1 (nur 32) 0206160000
2 ZTD 1771810000
3 ZTL 1771800000
4 KSBR/2 1771820000
5 STB 21.
5 STB 21.
3.Comparison measurement for L1
Operation depending the operating status:
1. Close short-circuit slide terminals and 2. Order No.
3. Connect external power supply the sockets of
terminals and 10. Close short-circuit slide terminals and 2.6 ZTL (3)
KSBR/2 (4)
C
Terminals,Z-Series
C.6 1071030000
12 STB 21.
3.6 VI
(10) STB 21. 5):
Pos.6 1071040000
6 SSP ZTL 100 1771860000
7 ZTW ZTL 1771870000
8 BZT ZTL 1781140000
Optionally available for better labelling
(instead Pos. Order No.6 1071020000
11 STB 21.6 1071010000
10 STB 21. Open disconnect slide link terminal 2. Connect voltameter test sockets terminals 7
and 10.
2.
Operating status
(with internal distribution the k-point)
ZTL 6/STB
ZTD 6/STB
Operation depending the operating status:
1. Type Qty. Connect ammeter test sockets terminal 2.6 1071000000
9 STB 21. Type Qty.6 1071080000
Optionally available for shared k-point:
Test-disconnect terminal blocks for measuring with ZTL 6
ZQV 6/30 (13)
ZTW ZTL (7)
SSP ZTL (6)
BZT ZTL (8)
(1) ZEW 35
(2) ZTD 6
(5) STB 21.68 1282250000 2012/2013
. Open disconnect slide link terminals and 7. Open disconnect slide link terminals and 7.
Operation depending the operating status:
1.
2. Disconnect meter for terminals and 7