6 1071010000
10 STB 21.
Operating status
(with internal distribution the k-point)
ZTL 6/STB
ZTD 6/STB
Operation depending the operating status:
1. Connect ammeter test sockets terminal 2.6 1071040000
6 SSP ZTL 100 1771860000
7 ZTW ZTL 1771870000
8 BZT ZTL 1781140000
Optionally available for better labelling
(instead Pos.6 1071080000
Optionally available for shared k-point:
Test-disconnect terminal blocks for measuring with ZTL 6
ZQV 6/30 (13)
ZTW ZTL (7)
SSP ZTL (6)
BZT ZTL (8)
(1) ZEW 35
(2) ZTD 6
(5) STB 21. Order No.6 GN
(9) STB 21. Type Qty.6 VI
(10) STB 21.6 ZTL (3)
KSBR/2 (4)
C
Terminals,Z-Series
C. Order No.
5 STB 21.6 1071000000
9 STB 21.68 1282250000 2012/2013
. 5):
Pos. Open disconnect slide link terminal 2.
2. Connect voltameter test sockets terminals 7
and 10. Close short-circuit slide terminals and 2.6 SW
(11) STB 21.
3. Close short-circuit slide terminals and 2.Comparison measurement for L1
Operation depending the operating status:
1. Type Qty.6 1071020000
11 STB 21.
1 ZEW (nur 35) 9540000000
1 EWK1 (nur 32) 0206160000
2 ZTD 1771810000
3 ZTL 1771800000
4 KSBR/2 1771820000
5 STB 21.6 1071030000
12 STB 21.
Meter test for through external power supply
Changing the meter for L1
Test-disconnect terminals
W Y
Pos.
2. Connect external power supply the sockets of
terminals and 10.
3. Open disconnect slide link terminals and 7. Open disconnect slide link terminals and 7.
3.
2. Disconnect meter for terminals and 7.
Operation depending the operating status:
1