Productivity the process optimised phase phase
Every panel building project starts with planning lays the foundation for
efficiency and quality.
The result: integrated solutions that save time, avoid errors and measurably increa-
se your productivity from the first planning step ongoing operation.
Your benefits glance
Operation
• Integrated test points for easy
maintenance and diagnostics
• Tool-free rewiring possible with
PUSH and SNAP IN
• Robust, low-maintenance connection
technology ensures maximum system
availability and easy expandability
Installation
• SNAP technology for lightning-
fast, tool-free connection
of conductors even with
pre-assembled wires
• PUSH connection for
vibration-resistant, gas-tight
connections with minimal effort
• Clear functional assignment
through colour coding and
large marking areas
Planning
• 75% time savings
in engineering
• Faster planning with the
Weidmüller Configurator (WMC)
• Automatic compatibility
check terminals,
accessories and markers
• Consistent data models
for seamless integration
into ECAD systems
III
CAT1 Version 2025
Overview
Panel process
. This followed work preparation, assembly, testing and
commissioning. support you the best possible way each these phases,
we have structured and specifically optimised the entire process into the three
core areas planning, installation and operation