RELAYS Panasonic

| Kategorie: Katalog  | Tento dokument chci!

Panasonic is part of a large worldwide groupselling relays and associated switching products under different brand names in different territories.The conditions of use in some territories may differ from those customary in Europe. In particular there are often major differences in regard to national and international specifications, such as UL, CSA, VDE, SEV, EVE, SEMKO, etc. Thus, when considering contact loads as stated in this catalogue (e.g. 10 A, 30 VDC for the SP relay) its hould be understood that these values are not necessarily an absolute maximum but tested ratings. Mostly the stated value has been tested for a certain life expectancy as stated by the manufacturer or the respective test house. Thus, under different conditions, the stated “maximum” may, in practice, be safely exceeded.

Vydal: Panasonic Electric Works Czech s.r.o. Autor: Panasonic

Strana 962 z 1090

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
The value the figure param eter “m” represents the type of the failure. Initial failures are screened at m anufacturer's site through burn-in process. eibull distribution expressed the following equation: W eibull distribution can adopted the actual failure rate distribution the three variables above are estimated. Failure rate high the beginning and end its service lifetime. hile zero accidental failure rate desirable, this actually not practical the real world. some cases this represents more practical value of reliability than MTTF. 2 e Product's failure rate throughout its lifetime depicted bathtub curve, as shown below. [3] FAILURE 1. This process called debugging, performing aging or screening. • Different types failures can be identified the chart. The following describes the correlation with the bathtub curve. (III) ear-out failure period In the final stage the product's service lifetime comes the ear-out failure period, which the life the product expires due ear fatigue. 3 is W eibull analysis often used for classifying product's failure patterns and determ ine its lifetime. (I) Initial failure period The high failure rate the initial failure period derived from latent design errors, process errors, and many other causes.Reliability 5 ife Safe life inverse degree of reliability. Preventive maintenance effective for this type of failure. (II) Accidental failure period The initial failure period followed a long period with low, stable failure rate. The timing relay's wear-out failure can predicted with certain accuracy from the past record uses. The use relay intended only the accidental failure period, and this period virtually represents the service lifetime of the relay. ilu ? Failure defined state system, equipment, com ponent which part of all its functions are impaired lost. • The eibull probability chart easy to use. • hen Initial failures • hen Accidental failures • hen ear-out failures ds_x61_en_relay_technical_information_091112D 23 . In this period, called accidental failure period, failures occurs random along the tim axis. f(x) m Figure parameter a easurem ent param eter y Position param eter The eibull probability chart sim pler alternative com plex calculation formulas. The chart provides the following advantages: • The eibull distribution has the closest proximity the actual lifetime distribution. given value which makes the following equation true: 1 R(B) % In general, “B[1 R(B)] 10% more often used