Modular Terminal Blocks Catalogue 2012/2013

| Kategorie: Katalog  | Tento dokument chci!

Terminals, P-Series (PUSH IN technology) Terminals, Z-Series (Tension clamp technology) Terminals, W-Series, Stud terminals, SAK-Series (Screw connection technology) Shield connection terminals KLBÜ AccessoriesAppendix

Vydal: Weidmüller, s.r.o. Autor: Weidmueller

Strana 289 z 571

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
6/45 WAP WTL6 SL GWHUE WTL6 (19) (2) WQV 6/5 (2) WQV 6/5 D Terminals,W-Series D.6/45 (11) BS (10) BS (12) STB 21.6/45 1936260000 1 16 WKS 2/2 1936150000 3 17 WAP WTL 9538110000 1 18 SSP 0531760000 1 19 GWHUE WTL6 1255010000 3 Example transformer using WTL WTD EN (9) STB 36. Many switching tasks can done using the WTL test/disconnect terminals and the WTD feed-through terminals. This guarantees that the measuring instrument not accidentally disconnected.6/45 (13) STB 21.8/IH/VI (6) STB 36.6/45 SW (7) STB 36.8/IH/BL (8) STB21.8/IH/GE (4) WTL SL/EN (3) WTD SL/EN (1) WEW35/2 WAP WTL (17) SSP (18) WKS 2/2 (16) BS (14) STB 21. Type Order No.8/IH/BL 1847790000 1 10 0335700000 1 11 STB 21.8/IH/GE 1847760000 4  6 STB 36.6/45 (15) STB 21. The screws for connecting the conductors are only accessible after the current transformer has been short- circuited with the help the short-circuit slider.Testing made easy WTL WTD EN Current transformers may only short-circuited operated with negligible load impedance because open current transformers “run hot” and destroy themselves.8/IH/GN (5) STB 36.8/IH/VI 1847780000 1  8 STB21.6/45 1936270000 3  9 STB 36.6/45 1936240000 1 12 0335600000 1 13 STB 21. Qty.8/IH/GN 1847770000 1  7 STB 36.691282250000 2012/2013 .  1 WEW35/2 1061200000 2  2 WQV 6/5 1062660000 1  3 WTD 9538100000 3  4 WTL 9538080000 7  5 STB 36. Test-disconnect terminals Ordering data W Pos.6/45 1936250000 1 14 0335800000 1 15 STB 21. Apart from that, load impedances lead measuring inaccuracies in electricity supply meters and hence financial losses for their operators