MEATEST: Uživatelské příručky kalibračních měřidel

| Kategorie: Návody k obsluze  | Tento dokument chci!

Vydal: Meatest, spol. s r.o. Autor: MEATEST

Strana 792 z 1270

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
Confirm with ENTER button rotary button. 15Vhas tobeapplied. Output terminals are automatically switched on at the same time ready for measuring the selected calibration point. • When built mA-meter calibrated, connect current requested valuefrom standard unit and confirmwith ENTER button rotary button save new calibration data.r. Input resistance internal mA-meter approx. Calibrator returns the last selected function. When only some calibration points are changed, all other non­ changed calibration points are stored with original data.5 kQ. Confirm with ENTER button rotary button. • Connect RCL standard meter when capacitance calibration point beingcalibrated andwrite down new resistance value. When change the calibration value requested push the rotary button ENTER button once more. Calibration points Each function the calibrator has assigned fixed calibration points which have set during the calibration. Standard current source with compliance voltagemin. Go next requested calibration point. The original calibration value refreshed. Calibration process can interrupted left any time pushing the button SETUP. List calibration points includes: • Single resistance segments summary range from 1TQ, R00 R45 • Single capacitors 10, 50, 100 nF, C00 C02 • voltage 5000 V00 and V01 • current mA, I00 and I01 28 User Manual . Use rotary button move the cursor through the list. Both complete and partial calibration possible. s.M191 Insulation Tester Calibrator MEATEST. 2. Having selected the required function calibrated, press the rotary button ENTER button enable the calibration value right column for editing. New calibration value saved immediately when ENTER button rotary button pushed for new value confirmation. • When built kV-meter calibrated, connect voltage requested value fromstandard unit and confirmwith ENTER button rotary button save new calibration data. Selection and setting ofcalibration point After the calibration menu displayed, one partial calibrations can selected.o. • Measure the resistance value using standard ohmmeter when resistance segment calibrated and write down new resistance value. Note: When resistance points are calibrated two-terminals way connection the calibrator tostandard ohmmetershouldbeapplied