A HISTORY OF EDISON'S WEST ORANGE LABORATORY 1887-1931

| Kategorie: Kniha  | Tento dokument chci!

Vydal: Neurčeno

Strana 432 z 567

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.

Jak získat tento dokument?






Poznámky redaktora
Miller's staff was housed Kellow's office. The lab's shop order system was reformed this time and the management stressed the importance understanding and using the system. All product engineer's work was billed the relevant divison managers, and they were normally the ones who initiated his line of research. The total number purchase shop orders was the means to estimate the value the laboratory's work. Chart 10-3 shows the floor plan before the changes, the Music Room one end and Dinwiddie's experimental room at the other. The main office the lab was the third floor and adjacent was the room Harry Miller, secretary and treasurer TAE Inc. The Music Room was maintained and two small offices were created for recording research and the disc experiments Dinwiddie. Chart 10-4 shows the new floor plan. The administrative offices take only a small part the floor space; most the third floor was taken with experimenting. the other end the third floor was complex of the drafting and testing services and the office the chief engineer; the Engineering Department was therefore brought . Next these rooms was the office R.W.X-30 requisitioned the services the laboratory. The changing role the lab the Edison enterprise can be gauged the reorganization the third floor Building 5 1916. Kellow, one Edison's secretaries who also handled all the bookkeeping and work scheduling the lab