Harting Sbírka katalogů říjen 2013

| Kategorie: Katalog  | Tento dokument chci!

Vydal: HARTING s.r.o. Autor: HARTING

Strana 579 z 808

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
y Getting work - safely and easily With record heights the hub (i. electric cable winch used the drive, and runs the cabin and down supporting cable. A such enormous heights important for people w orking the turbine and their equipment be transported simply and quickly the top order save time and money during installation and servicing. The load- capacity and space availability the lightw eight structures are designed for two people. 24. Here, the drive command issued via buttons the outside the cabin. Both cables are securely anchored. most cases, the route follows the ladder inside the tower. These so-called service cabins provide safe, reliable and cost-effective means transporting people and materials/equipment elevated workplaces. the center point the rotor) now excess 160 modern wind turbines are even higher than the famous “Kolner Dom” cathedral in Cologne, which measures just over 157 m. The service cabin makes much easier and far more comfortable to travel and down the tower. safety cable parallel the supporting cable with gripping device also provided.e. To the top elevator Various manufacturers offer small-size elevators which have been specially designed for wind power plants. automatic mode also available for transporting materials for sending the lift pick up other people. Ladders are also provided that service engineers can climb down emergency. In these very tall wind turbines, this done with the aid of elevator. Controls for transporting people are housed switch box inside the elevator cabin