3. Step:
Removing cable sheath and wire stripping (10
mm).2 Disassembly
1 Step:
Insert screwdriver into the side slot of
the active termination element an
gle and slide this out
2 Step:
Pull the wire out. Step:
Visual inspection Check the wire deep en
ough the contact chamber. Fast, simple and compact!
3. Step:
Insert wire into the Han-Quick Lock® contact
chamber.Han-Quick Lock® Han-Quick Lock
Description the Han-Quick Lock® system
3. Step:
Push the active termination element with scre
wdriver until comes stop. Step:
Tensile test Check, whether the wire the
contact chamber firmly enough.
9
.
5.
3... not twist conductors.1 Assembly
1.
4.
2