9
.
2.
4.
3. Step:
Visual inspection Check the wire deep en
ough the contact chamber. Step:
Tensile test Check, whether the wire the
contact chamber firmly enough.1 Assembly
1.
5. Step:
Push the active termination element with scre
wdriver until comes stop.Han-Quick Lock® Han-Quick Lock
Description the Han-Quick Lock® system
3..
3.2 Disassembly
1 Step:
Insert screwdriver into the side slot of
the active termination element an
gle and slide this out
2 Step:
Pull the wire out.. Step:
Insert wire into the Han-Quick Lock® contact
chamber. Step:
Removing cable sheath and wire stripping (10
mm). Fast, simple and compact!
3. not twist conductors