Harting Sbírka katalogů říjen 2013

| Kategorie: Katalog  | Tento dokument chci!

Vydal: HARTING s.r.o. Autor: HARTING

Strana 225 z 808

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
3. Insert the stripped end the conductor into the termination entry the module until the insulation touches the contact. Strip the conductor length 19+1 mm 2. tighten the locking screw, hexagonal wrench size needed. 5. Once all modules are terminated, they are mounted into the housing by means two metal frames (tightning torque the fixing screws 0. 6. 4. . Due the hexagonal slot, each module can be used different positions (turning every degrees). Push the conductor through the cable gland and the housing. the same time, push the conductor over the axial screw. This possibility can used create coding system. Insert the hexagonal wrench the mating side the contact. The heads the fixing screws have face the mating direction the module.3.43 44: Mounting instructions 1. Therefore important that the corresponding modules are assembled in the correct position mating not possible. The user should make sure that the cable adequately strain reliefed to protect the contact from radial stress.2. Final assembly the contacts.5 Nm). After the assembly the modules the housing, the tightning torque of the locking screw can checked and corrected necessary. 5. The modules have hexagonal around which mates with the metal frame.Special Applications 195 5.3 Assembly manual for Han®HC Modular 350 A Fig. The locking screw has tightened with the recommended tightning torque that is determined the conductor's cross section (6-14 Nm)